Design and Installation New Indoor Adventure Centre

NMRN Operations Published 6 Jan 2020 Contracts Finder

key details

Value£85,000
Statusactive
Category (CPV) 37535200 +3 more
RegionNorth East
Deadline17 Feb 2020
Contract start23 Mar 2020
Contract end7 Aug 2020
Procedureopen
SME suitableYes
OCIDocds-b5fd17-b575cb6c-c687-49b7-9b57-1606b01a3a5a

description

The National Museum of the Royal Navy Hartlepool exists as a themed Georgian seaport with HMS Trincomalee (the oldest floating warship in Europe) acting as a centrepiece to the attraction. Having recently transferred a WW2 rescue vessel to the site, we are preparing to expand our Royal Navy narrative through large scale redevelopment works over the next 3-5 years which will allow us to tell a much broader story of the Royal Navy and its past, present and future. Whilst we plan for this, we are making some immediate interventions to improve facilities for visiting families.

The museum has an indoor activity area which is nautically themed with science based 'hands on' activities. These are no longer serviceable and it is the aspiration of the museum that the existing equipment is removed in favour of installing an activity area which offers a more exciting physical challenge. Consultation with visitors has identified the following types of activity could be popular:

-Climbing wall
-Indoor ropes/assault course
-Net ('rigging') climbing
-Laser tag
-Themed soft play

Other options would be considered however, particularly if they present a more unusual offer that may not be available locally.

Tender submissions are invited for the design and installation of this new space.

A site visit is integral to any submission. We encourage all contractors to engage with Museum staff to ensure that they understand the site.

Design Specifics

  1. The identified area i...udget of 85k GBP for the delivery of this project. All costs (including strip out of existing and waste removal and redecoration works) must be included.

Details of warranty must be included.

Details of future repair and maintenance costs must be included although it is accepted that these will be recurring costs over and above the 85k GBP tender value indicated.

General

The Museum would appoint said contractor(s) in the role of principle designer and also that of principal contractor(s) (as defined in CDM 2015) as appropriate.

Any submission should account for overall project management which would include the liaison with relevant officers within not only the museum, but also other stakeholders where appropriate (e.g. service users, Hartlepool Borough Council planning department etc).

The contractor(s) will provide an appropriate construction phase Health & Safety plan for the project and ensure appropriate risk assessment and method statements are undertaken for every stage of the project and in addition, develop a scheduled works plan. This must include the provision of an access plan, describing how you will achieve the project in relation to our complex site (this includes the provision of managing the installation while the site is open to the general public for the duration of the project).

The contractor(s) must demonstrate how it will abide by both the security and health and safety regulations of the museum in addition to any national regulations.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
6 Jan 2020 Tender (tender) · 953722cb-5c5d-4eb6-822a-cc6e98e0ef7f-335284

more from NMRN Operations

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.