gvtcx

Design Team for the refurbishment of Stephenson Memorial Hall

Chesterfield Borough Council Published 8 Nov 2021 Find a Tender

key details

Value£1,200,000
Statuscomplete
Category (CPV) 71000000
Deadline14 Dec 2021
Contract start25 Jan 2022
Contract end30 Nov 2024
Procedureopen
SME suitableYes
OCIDocds-b5fd17-b3a53175-b3e0-47e3-b9f0-267c886e4b7d

Award

SupplierValueDateStatus
Bauman Lyons Architects £1,313,866 25 Jan 2022 active

description

Chesterfield Borough Council (CBC) is seeking to contract an experienced architect led multi-disciplinary team to progress the technical design of the refurbishment of the Stephenson Memorial Hall, Corporation Street, Chesterfield.

The Lead designer and consultants will be required to take the existing Stage 3 package of design work for the Stephenson Memorial Hall project from RIBA Work Stage 4 to RIBA Work Stage 6.

Chesterfield Borough Council owns and manages the Stephenson Memorial Hall. One part of the building is currently used as the Pomegranate Theatre and the other part as Chesterfield Museum.

The re-design of the building to RIBA Stage 3 combines the museum and theatre uses to enable the building to be seen as an integrated cultural venue in the town and extend the life of an important heritage asset.

The refurbishment must be complete by November 2024

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
8 Nov 2021 Contract notice (F02) Earlier regulations 028001-2021
25 Apr 2022 Award (award) · c7bcd793-6af4-4256-811d-06c99b420cfc-531688

more from Chesterfield Borough Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Find a Tender. Contact details for named individuals are not reproduced on this site.