Urban Gull Surveys 2020 Project (Lot 3 off ES Framework)
key details
| Value | £398,190 |
|---|---|
| Status | complete |
| Category (CPV) | 90700000 |
| Deadline | 12 Mar 2020 |
| Contract start | 6 Apr 2020 |
| Contract end | 28 Aug 2020 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-125d0760-2606-4223-9e3f-44891a5678c8 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| BL Ecology Ltd | £398,190 | 5 Apr 2020 | active |
description
Background
Gulls, particularly herring and lesser black-backed gulls, have expanded their breeding distribution into urban areas, and present a problem for survey and monitoring. The current seabird census, Seabirds Count, uses a 1 km sample square design to estimate nesting gull abundance and distribution within a representative sample of urban habitats. These 1 km squares are used to model and estimate abundance at wider spatial scales, based on habitat availability. In England, we have about 3,800 1 km urban squares across the country which require survey visits in 2020.
Additionally, we require 100 of these 1 km squares to also be surveyed within the same breeding season using digital aerial survey methods. The precise location of these squares is yet to be determined, but contractors may plan for them to be located in one or more 'clusters' to minimise aircraft travel distances and times. This is to build upon an existing Defra project awarded to BTO / HiDef Aerial Surveying designed to develop correction factors for ground-based urban gull surveys (Annex D).
Aims and objectives
The primary aim is to organise, manage and deliver coverage of these 3,800 1 km squares, and additionally cover 100 of them by digital aerial survey for comparison. In order to meet this aim, Natural England expects bidders to meet the following objectives:
| 1. | Source and manage suitably qualified field surveyors to visit each of the squares required and ensure each square is surveyed within the defined survey period; |
| 2. | Collate data collected and present resulting data files, ensuring data can be shared in a format usable for analysis by the Joint Nature Conservation Committee (JNCC), within the timetable set out below; |
| 3. | Commission digital aerial surveys for 100 of the 1 km squares, including flight planning, data collection and image processing, producing data files for separate analysis; and |
| 4. | Prepare a brief report description |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Jul 2021 | Award (award) | · | 1522399e-2a7f-40a7-972e-ce3604d62aa9-455683 |
more from Defra Network eTendering Portal
- Professional Services TPP Communication to Market · £1 · 19 Feb 2025
- Print and Postal Services TPP Comms to Market · £1 · 19 Feb 2025
- Communications and Marketing TTP Comms to Market · £1 · 19 Feb 2025
- Employee Benefits and Wellbeing TPP Comms to market · £1 · 19 Feb 2025
- APHA Courier International Specialist · 15 Jan 2025
- P-37177 Service Contract for DNA Analyser/KingFisher Ex robots/Thermal Cyclers · 7 Jan 2025
- Environmental Land Management Payment Rate Development and Verification · £1,200,000 · 12 Dec 2024
- Local Air Quality Management (LAQM) Support Contract · 4 Nov 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- The Provision of Ecology Services · Loughborough University
- Provision of Wastewater Quality Testing Service · Armagh, Banbridge & Craigavon Borough Council
- Biodiversity Net Gain (BNG) · NORTHUMBRIAN WATER LIMITED · £5,700,000
- SAMM (Strategic Access Management & Monitoring) for the Wealden Heaths Phase II Special Protection Area (SPA) · East Hampshire District Council · £432,000
- Production of seabird flight height distributions from at-sea laser rangefinder data · JNCC SUPPORT CO · £28,000
- Natural Capital Baselining on Glenlivet Estate · Crown Estate Scotland · £472,143
- Strategic Flood Risk Assessment and Water Cycle Study · Borough Council of Kings Lynn and West Norfolk
- National Marine Plan 2 (NMP2) Social and Economic Impact Assessment · Scottish Government · £8,834
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.