Blockwork C4 - KCSL
key details
| Value | £1,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45262521 |
| Region | London |
| Deadline | 22 Aug 2024 |
| Contract start | 1 Oct 2025 |
| Contract end | 30 Jul 2028 |
| SME suitable | No |
| OCID | ocds-b5fd17-b1f127ac-3f7e-466a-87d8-bd2335c69c9b |
description
Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the construction of external and internal blockwork to numerous station buildings.
| • | OCC South Portal |
| • | West Core |
| • | East Core |
| • | Train Crew and Catering Building |
| • | Euston North Portal |
| • | Cycle Hub |
Works include blockwork walls of varying thickness and grades, wind posts, vertical and horizontal restraint details, masonry support angles, wall ties, bed reinforcement, cavity trays, joints, fire sealant and all ancillary items where required. This includes detailing all openings including additional supports around the openings. Works will also include mock ups, samples and quality benchmarks as well as requiring potential development of nonstandard blocks to deliver the project requirements.
Blockwork Subsubcontract works includes the provision of all necessary People, Equipment, Plant and Materials for the construction of the buildings external & internal blockwork.
The Subsubcontractor will be responsible for progressing the RIBA stage 4 design to Stage 5 for construction .This will require submission to, and approval from, the Subcontractor, Contractor, the Contractor's representatives and the Employer to ensure the provided Subsubcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assurance requirements.
The scope also includes the design, supply, installation, management and removal of temporary works required to execute the subsubcontract works.
Quantity of blockwork CIRCA 5100m2.
Expected Subsubcontract award Jan 25
Construction is to be carried out over a 3 year period commencing in Q3 2025 and completing in late Q2 2028. Multiple visits will be required over this period.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=84155638 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/3e2f6b9e-3741-4b22-a654-7b3a86a22b8f , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 16 Aug 2024 | Tender (tender) | · | 3e2f6b9e-3741-4b22-a654-7b3a86a22b8f-778194 |
more from Kilnbridge Construction Services Ltd
- CBGM Installation - KCSL · £250,000 · 6 Jan 2026
- Attenuation Precast Tanks · £1,000,000 · 4 Sept 2025
- Vehicle Restraint Barriers C4-KCSL · £100,000 · 8 Jul 2025
- Fit-Out Package C4-KCSL copy · £10,000,000 · 3 Apr 2025
- Fit- out C4 -KCSL · £100,000 · 13 Mar 2025
- Screeding C4-KCSL · £1,000,000 · 13 Feb 2025
- Spray Waterproofing C4-KCSL · £150,000 · 28 Jan 2025
- Material Testing, Environmental Engineer Geo Tech - C4- KCSL · £1,000,000 · 28 Jan 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Milton Keynes Council - Synergy Park Replacement of Eroded Brickwork · LGSS
- Brickwork Repairs and Wall Stabilisation Works at Holy Trinity Vicarage East Hill, Dartford · Dartford Borough Council · £23,696
- Repointing of Brickwork – Redcar Lifeboat Museum · Redcar & Cleveland Borough Council
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.