Thames Tideway Tunnel - C405 Main Works West - Putney Tunnel Connection Shutter

key details

Statuscomplete
Category (CPV) 45262670
RegionLondon
Deadline2 Nov 2020
Contract start1 Dec 2020
Contract end16 Feb 2021
Procedureopen
SME suitableNo
OCIDocds-b5fd17-b1c3ec49-028f-4460-9b55-253c50b1ea22

Award

SupplierValueDateStatus
not named £20,000 30 Nov 2020 active

description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

  • a.tunnels:
  • i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
  • ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
  • b.Worksites:
  • i.five main tunnel Worksites (drive and/or reception sites)
  • ii.16 CSO Worksites
  • iii.two System modification Worksites Thames Tideway Tunnel
  • iv.works at Beckton Sewage Treatment works.

Section 4: Scope of Works

BMB JV are looking the supply only of all associate items required to assemble the Putney Connection Shutter as detailed in the drawings provided with this advert.

BMB will assemble the shutter in the tunnel. The supplier shall deliver the shutter in parts that can be easily handled into place at the Putney Connection. Delivery will be to Carnwath Road Site. BMB will be responsible for moving the shutter into place in the tunnel.

All deliveries must comply with BMB JV's delivery procedures including FORS.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

Cost

Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR

Additional information: BMB-JV Tideway West, Carnwath Road Riverside, Carnwath Road, London Borough of Hammersmith & Fulham, SW6 3HR

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
26 Apr 2021 Award (award) · 41b0c1c5-a0e0-46dc-9837-18f05a4f2b5f-431109

more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.