GB-Swindon: UKRI-2461 Sextupoles for the FEBE Arc Line
key details
| Value | £53,200 |
|---|---|
| Status | complete |
| Category (CPV) | 31630000 |
| Deadline | 25 Sept 2022 |
| Contract start | 28 Sept 2022 |
| Contract end | 11 Sept 2023 |
| SME suitable | No |
| OCID | ocds-b5fd17-b17b543e-70fb-4f1b-b392-2f07a80b2a47 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Danfysik A/S | £53,200 | 25 Sept 2022 | active |
description
The Science and Technology Facilities Council (STFC) requires a pair of sextupole magnets for the Full Energy Beam Exploitation (FEBE) section of the Compact Linear Accelerator for Research Applications (CLARA), a linear accelerator currently under construction at STFC Daresbury Laboratory.
The sextupoles are a recent change in design to a beamline which has already begun construction and as such are strictly limited in total length to no more than 100mm, and are expected to be used at gradients of up to 255 T/m2 for a total integrated gradient of between 24.5 and 25 T/m.
These magnets will be positioned in a left-right arc section of beamline with high transverse beam dispersion and will be used to help control the linear dispersion with the aid of a beam mask, allowing us to deliver highly compressed electron beams to users. The electron beam energy through these magnets will be up to 250 MeV.
Additional information: Procurement Contract Transparency Data: Redacted contract documents will be made available within the next 30 days on the UKRI website at: https://www.ukri.org/about-us/procurement-contract-transparency-data/
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 27 Sept 2022 | Award (award) | · | dc98a61a-7a8e-4ecf-ac9f-0c51556f328e-575085 |
more from UK Research & Innovation
- UKRI-5644 Cleaning Services at Boulby Underground Labs · £300,000 · 28 Jul 2026
- UKRI-6147 Benchtop Flow Cytometer · £78,842 · 27 Jul 2026
- UKRI-5389 Supply of Fruit and Vegetables · £175,000 · 22 Jul 2026
- UKRI-6210 MRC LMB Microscope Repair and Maintenance services · £65,656 · 21 Jul 2026
- UKRI-6103 CLF 109 EPAC Bulk Nitrogen · £105,000 · 2 Jul 2026
- UKRI-6164 Atlassian License Renewal - 26/27 · £53,528 · 29 Jun 2026
- UKRI-6102 CLF R2 LN2 Bulk Nitrogen · £70,000 · 24 Jun 2026
- UKRI-6095 Supply of Liquid Nitrogen, Dry ice and Bottled gases to RCaH · £135,000 · 23 Jun 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- 9004557 - Supply of a Canted 3-Pole Wiggler for Diamond Light Source · DIAMOND LIGHT SOURCE LIMITED · £200,000
- 9004199 - Supply of Booster Kicker Magnets for Diamond-II · DIAMOND LIGHT SOURCE LIMITED · £1,200,000
- 9003706 - Supply of Thin Septum Magnets · DIAMOND LIGHT SOURCE LIMITED · £780,000
- MAST-U P1 & Pc Coils · UK Atomic Energy Authority · £500,000
- 9001907 - Supply of Fast Corrector Magnets for D-II Storage Ring · DIAMOND LIGHT SOURCE LIMITED · £450,000
- 9001300 - Diamond-II Storager Ring Octupole Corrector Magnets · Diamond Light Source Ltd
- 9000960 - Diamond-II Storage Ring Octupole Magnets · Diamond Light Source Ltd
- DLSITT1051 - Diamond-II Ring Octupole Corrector Magnets · Diamond Light Source Ltd · £0
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.