Thames Tideway Tunnel - C405 Main Works West - Hammersmith Security Gates & Fencing
key details
| Value | £1 |
|---|---|
| Status | complete |
| Category (CPV) | 34928200 +1 more |
| Region | London |
| Deadline | 19 Feb 2021 |
| Contract start | 12 Mar 2021 |
| Contract end | 31 May 2021 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-b0d0410c-e2ed-4f56-b5ad-9781e8ff4b1c |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | £108,700 | 26 Apr 2021 | active |
description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
- a.tunnels:
- i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
- ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
- b.Worksites:
- i.five main tunnel Worksites (drive and/or reception sites)
- ii.16 CSO Worksites
- iii.two System modification Worksites Thames Tideway Tunnel
- iv.works at Beckton Sewage Treatment works.
Section 4: Scope of Works
BMB JV require an experienced Subcontractor to install high security gates and fence at Hammersmith Pumping Station Site (HAMPS). The security gates and fence will demarcate and protect the boundary between Fulham Reach Development and Thames Water. This will include the replacement of a vehicle gate and installation of a new pedestrian gate on Chancellor's Road boundary.
Attached are gate 4 drawings for the works, the successful Subcontractor will be required to produce fabrication drawings to gate 5 for approval by the Contractor.
The new fence is specified as high security proprietary Zaun Armaweave - refer to drg: '3320-AAJVX-TTWES-420-CR-DR-000106' for full specifications. The perimeter is highlighted in drg '3320-AAJVX-HAMPS-590-LZ-DR-000200 - Marked Up'.
The area will be cleared and filled to substrate level by BMB JV. The Subcontractor will be required to construct the foundations and install the gate as per 3320-AAJVX-HAMPS-590-LZ-DR-000200 and 3320-AAJVX-HAMPS-590-LZ-DR-000300.
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Additional information: BMB-JV Tideway West, Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=53753599 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/b0a21629-500f-44ca-b3dd-d74e43e8ee0c , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Jul 2021 | Award (award) | · | a1a46b70-d492-4185-91fc-cece03c46204-453799 |
more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Thames Tideway Tunnel - C405 Main Works West - Carnwath Road Pit Bottom Steel Alterations · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Intertidal Terrace · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Pipe Jacking works for Syphon Main ACTST · £500,000 · 9 Apr 2021
- Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking · 12 Mar 2021
- Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Steel Connection Shutters · 5 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Acton) · £1 · 8 Jan 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead · £1 · 21 Oct 2020
- Thames Tideway Tunnel - C405 Main Works West - Putney Tunnel Connection Shutter · 21 Oct 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- V4SDDC047 New Play Equipment (Rosliston) · South Derbyshire District Council · £300,000
- Award of City Campus Fence Replacement Project · North East Scotland College · £75,674
- Supply of Building Materials · Nottingham City Council · £31,400,000
- Supply of Bow Top Fencing 2026 · Ipswich Borough Council
- Purchase of Fencing and materials · Clackmannanshire Council · £36,000
- P1197-1 - Springfield House School Landscaping Works - Lot 1 - AWARD · Birmingham City Council
- WEP I Cardiff and Vale College (CaVC) Project Batch: D&B Contract Selection Questionnaire (SQ) · Bouygues UK
- Tolworth Court Farm Boundary Fencing · The Royal Borough of Kingston upon Thames · £88,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.