gvtcx

London Overground Infrastructure Maintenance Contract (IMC2)

Transport for London - Rail for London Published 5 Jul 2017 Contracts Finder

key details

Statusactive
Category (CPV) 50330000 +8 more
RegionLondon
Deadline8 Aug 2017
Contract start23 Jan 2018
Contract end18 Jan 2023
Procedureselective
SME suitableNo
OCIDocds-b5fd17-b076b8eb-94f7-456e-8b2f-26c97717bfc5

description

Infrastructure Maintenance Contract covering London Overground East London Line Core Route, depots and West Anglia stations, to include the following:

  • Planned and faulting maintenance of depots, stations and other buildings, track, signalling, telecommunications, mechanical and electrical, electrification and environmental assets on the ELL Core Route;
  • Signal and telecommunications maintenance on the ELL between the NR/LO boundary at Dalston Western Curve and the end of the route at Highbury and Islington;
  • Depot systems (S&T, track inspections) at Wembley Sidings.
  • Station Landlord maintenance responsibilities on the LO West Anglia route, including civil and structures.

Additional information:

All SSQ documents can be downloaded from the following address: https://procontract.due-north.com This opportunity has also been published under OJEU Contract Notice 2017/S 126-255751

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Jul 2017 Tender (tender) · 4550123b-fe58-4255-993c-7e1da5cbf8f6-158336

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.