The Provision of Integrated Water Management Studies
key details
| Value | £180,000 |
|---|---|
| Status | active |
| Category (CPV) | 71313000 +5 more |
| Deadline | 16 Sept 2022 |
| Contract start | 10 Oct 2022 |
| Contract end | 31 Dec 2024 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-af439c62-a735-49c5-8934-4dc11823f39c |
description
The Council intends to start a review of the Local Plan in 2022 for which Integrated Water Management Studies (IWMS) will be developed to form an important element of the evidence base. The IWMS will include a Level 1 and 2 Strategic Flood Risk Assessment (SFRA) and Stage 1 and 2 Water Cycle Study (WCS). The studies will be undertaken in two phases as follows, with drafts required 6 weeks before.
Completion of Phase 1: Level 1 SFRA and Stage 1 WCS: 31 October 2023
Completion of Phase 2: Level 2 SFRA and Stage 2 WCS: 13 December 2024
Phase 1 will be used to determine future patterns of growth steering sites and growth towards the areas of the district at the lowest risk of flooding from all sources (taking climate change into account) in preference to medium and high-risk sites. It will also help the Council to understand the implications of growth patterns, the amount of growth that can be accommodated and broad locations within the district ensuring growth is as sustainable as possible. It should ensure that water infrastructure is identified to support projected employment and housing growth and that the cumulative impact of development (on a catchment wide basis), potential patterns of growth, changing land use and climate change is taken into account with regard to flood risk, water resources and wastewater management.
Phase 2 will support site specific flood risk assessments and strategies for growth, determine the acceptability of flood risk in relation to emergency planning capability; and allow the consideration of opportunities to reduce flood risk to existing communities and developments through better management of surface water, provision for conveyance and of storage for flood water. It will assess the specific implications of growth and suitability of sites and allocations including how potential regeneration areas can be addressed in terms of reducing flood impact on previously developed land taking into account all sources of flooding, water resources, management and quality with site specific recommendations provided.
documents
- https://procontract.due-north.com/Advert?advertId=26a77051-c201-ed11-8116-005056b64545
- https://www.contractsfinder.service.gov.uk/Notice/5a5381b3-02d8-4385-aea8-1d2f1bcda790 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/6eafdc11-27cb-43b1-9133-d449244f0955 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/8aa2bd8e-f212-438c-9ba9-b5869ed036bb , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/b3e12f4d-675b-485d-a371-bbea932cd004 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Aug 2022 | Tender (tender) | · | b3e12f4d-675b-485d-a371-bbea932cd004-565890 |
more from Huntingdonshire District Council
- Cleaning Services at Council sites · 18 Jun 2026
- Internal Audit Services · 9 Apr 2026
- GB-Huntingdon: TPPL Huntingdonshire District Council NEPO GM & P Lot 1 - 2 x Ride on Mower (Protected Operator Position) (New) (29738) · £69,900 · 27 Mar 2026
- AI Validator for Planning Applications · 23 Mar 2026
- Legal Support for Monitoring Officer · 23 Feb 2026
- Salary Sacrifice Scheme for Electric and Hybrid Vehicles · 6 Jan 2026
- GB-Bilsthorpe: TPPL Huntingdonshire District Council HCC Lot 7 - Telematics for initial 42 vehicles on Refuse Fleet (27635) · £39,228 · 27 Nov 2025
- Revenues & Benefits System Solution · 14 Oct 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Environmental Control Systems · Kent and Medway Mental Health NHS Trust · £294,000
- Sustainability Consultant Framework · Victoria and Albert Museum · £450,000
- Appointment of Independent Expert · Aberdeen City Council · £100,000
- Sustainability Framework · The Crown Estate · £6,000,000
- RFQ for RIBA Stage 2 Compliant Whole Site Decarbonisation Plans for Two Oxford City Council Depots - AWARD · Oxford City Council
- Ecology & Hydrology Surveys and Assessments · ANGLIAN WATER SERVICES LIMITED · £141,730,233
- Environmental Abatement Technology Standard Professional Services Contract - Extension · MCA - Maritime and Coastguard Agency · £60,000
- Aberfoyle Flood Protection Scheme Outline Design · Stirling Council · £111,843
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.