HMPS New Hall - Fire Safety Improvements (FSI) BPRN: 3228
key details
| Value | £2,428,883 |
|---|---|
| Status | complete |
| Category (CPV) | 45216113 |
| Region | North West |
| Deadline | 30 Jan 2024 |
| Contract start | 13 Nov 2024 |
| Contract end | 26 Aug 2030 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-ae1444f6-c766-423f-bbd6-9b8309d95489 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Wates Construction Ltd | £2,428,883 | 13 Nov 2024 | active |
description
To provide fit for purpose fire safety systems that comply with current statutory legislation within the built environment and adhere to the requirements set out in the latest CPFIG report and meets current MoJ technical standards.
- Improve site wide notification of a fire in a cell within a dormitory block, with new detectors that are fully addressable onto the establishments' site wide fire alarm system.
- Reduce the risk of further consequences following a fire related incident.
- Reduce reactive maintenance in terms of time taken to maintain and repair the current system and associated costs.
- Improve the long-term reliability of the fire alarm systems along with obtaining warranties for the all-new installations.
- Provide a single system type through the establishment, thus reducing the requirement for commissioning two separate maintenance contractors.
- Reduce complications caused during periodic inspection and test by operating over one system type.
- Contribute to MOJ's sustainability targets by upgrading the existing lighting to improve performance, reduce operating costs and improve reliability of lighting in accommodation areas.
A constructor has been appointed for the design and build of the project.
This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of
contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology.
The first stage will involve the constructor providing Pre-construction surveys and design services at
a cost of £2,428,882.72. It is expected that the total construction cost of the project will be c£24.5m.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Dec 2024 | Award (award) | · | 907d4ea9-a9aa-4ec9-a3cc-f37aeb31f8e5-813395 |
more from Ministry of Justice
- 4797400.47 · £4,797,400 · 24 Jul 2026
- Award of a call off contract under the Prison Education Dynamic Purchasing System for the provision of Self-employment and Employability Skills for Prisoners at HMP Swaleside. · £19,800 · 24 Jul 2026
- Award of a Call-Off Contract under the Prison Education Dynamic Purchasing System for prisoner training in the Prison Bakery at HMP Brixton · £38,250 · 24 Jul 2026
- Call off Contract Under Prison Education Dynamic Purchasing System for a Literacy Specialist for Prisoners at HMP Doncaster · £21,323 · 24 Jul 2026
- Call off Contract Under Prison Education Dynamic Purchasing System for Learning to Read courses for Prisoners at HMP Highpoint · £95,654 · 24 Jul 2026
- Managed Security and Information Assurance for the Youth Justice Services - 2026 · £632,726 · 24 Jul 2026
- Call off Contract Under Prison Education Dynamic Purchasing System for Car Valeting courses for Prisoners at HMP Leyhill · £10,800 · 24 Jul 2026
- Call off Contract Under Prison Education Dynamic Purchasing System for Outreach - Life Skills Personal Development Courses for Prisoners at Chelmsford · £30,500 · 24 Jul 2026
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- HMP Durham - Tythe Barn Refurbishment - BPRN 530/22/7895 [Constructor] · Ministry of Justice · £1,737,343
- HMPPS Woodhill-Shower Refurbishment-BPRN No.621/23/9688 · Ministry of Justice · £4,850,618
- HMP Holme House - Misting Reel Upgrade BPRN: 649/22/9472 [Constructor] · Ministry of Justice · £1,930,835
- HMPPS Parkhurst-Laundry Steam Room Upgrade · Ministry of Justice · £7,088,540
- HMP Wealstun Reclaiming Cells BPRN 604/23/10071 · Ministry of Justice · £2,448,392
- HMP Hatfield (Moorland) - Multifaith (DFMA) BPRN: 4657/20/6187 [Constructor] · Ministry of Justice · £3,540,436
- Contingency Response Programme - Package 3 · Ministry of Justice · £245,680,005
- Contingency Response Programme - Package 7 · Ministry of Justice · £73,130,279
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.