Works to The Tye Footpath
key details
| Value | £20,000 |
|---|---|
| Status | active |
| Category (CPV) | 14213000 |
| Deadline | 1 Dec 2024 |
| Contract start | 1 Jan 2025 |
| Contract end | 1 Jul 2025 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-ad1c7ba6-b44f-4147-8281-b724111016f9 |
description
| Demolition Specification | |
| Excavate existing footpath & ground to a depth of 160mm; remove all redundant material from site and dispose. Contractor to agree site measurement with Council representative and document prior to submission. | |
| The Works | |
| Phase 1 | |
| Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 111 meter long to North end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces. |
| Phase 2 | |
| Carry out demolition as specified. Lay new footpath; 1.2 meter wide between edgings x 119 meter long to South end of the Tye. Composite edging bedded on and haunched back & front with concrete. Every care must be taken in relation to levels; the contractor must account for water escape from the finished surface and any adjoining hard surfaces. |
Specification/Notes
| Include all site safety barriers for public, maintain public access throughout works. Ensure public Health & Safety during works. | |
| Install weed preventative and weight stabilising membrane to all new works; lay 100mm certified MOT type 1 crushed limestone or equivalent, machine roll. |
Adjust all manhole chambers, water/gas stop tap boxes etc in height to new finished surfaced pathway
Lay to total area 40mm 0f 20mm binder course tarmacadam and 20mm 0f 6mm surface course tarmacadam and machine roll.
Tar any joints with hot poured bitumen to seal where new surface meets surrounding surface.
Clear away and make good on completion
| Note: | |
| Please provide a price for each Phase as a separate works package including all associated set up costs. | |
| In the event that both Phase 1 & 2 are carried out concurrently please provide your discount for the combined works on the collection sheet |
documents
- https://www.contractsfinder.service.gov.uk/Notice/044f4b33-2761-490d-9dde-9c61b939ea8f , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/dcadf950-044e-4e02-8e23-4e9afe6c690f , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Oct 2024 | Tender (tender) | · | 044f4b33-2761-490d-9dde-9c61b939ea8f-787791 |
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Further Competition for Supply of Bagged Cold Lay Asphalt Products TPPL & NEPO Building Materials DPS - Category 2 DPS Reference: NEPO219 · Gateshead Borough Council
- Communal Car Parking Works · Wales and West Housing Association Ltd · £99,258
- Tramacadam Paving Repairs and Maintenance · South Staffordshire Dist Council · £226,800
- EKFB JV - G2S - Green Tunnel Laser Screeding · Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 · £1,000,000
- Framework Agreement for the Supply of Tarmacadam & Aggregates · Legal, Democratic and Business Intelligence, Swansea Council, · £4,000,000
- PLACE602H Supply of Road Repair Materials (ESPO 250_24) · Derbyshire County Council · £4,000,000
- 250_24 Road Repair Materials · Espo · £10,000,000
- PLACE492H Road Repair Products (ESPO 250_20 Framework) · Derbyshire County Council · £500,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.