gvtcx

GB-Poole: DH366 Alderney Hospital Replacement Boiler Plant Jersey Ward

Dorset HealthCare University NHS Foundation Trust Published 17 May 2016 Contracts Finder

key details

Value£100,000
Statusactive
Category (CPV) 71334000 +5 more
Deadline9 Jun 2016
Contract start30 Jun 2016
Contract end31 Aug 2016
Procedureopen
SME suitableNo
OCIDocds-b5fd17-ac8013c7-adc9-11e6-9901-0019b9f3037b

description

Electrical isolation of the boilerplant and strip out of its electrical services back to the control panel

Isolation of the boiler gas supply

Summer strip out of the existing boilerplant including most of the LPHW services in the plantroom, local gas supply pipework and the boiler flues and flue header Installation of temporary power supplies for the two hot water generators, the HWS secondary pump and the associated instrumentation and the new gas safety shut-off valve

Installation of a circular sheet steel protector to the 152 x 152 building column Extension of the boiler concrete base

Installation of a stainless steel flashing plate for the boiler flues replacing the wired glass panel above the plantroom doors

Installation of a back inlet gully immediately outside the plantroom with 100mm drain pipe to the existing manhole and 50mm metal sleeve through the outside wall

Installation of an extract grille and frame over the opening in the chimney stack left when the flue header is removed

Preparation of gas supply pipework

Shutdown of the gas supply and installation of a safety shut-off valve and isolating valves Installation of the new boilerplant with its flues, LPHW pipework, gas pipework, condensate and general drainage pipework

Installation of an expansion vessel and pressurisation unit with mains cold water supply, system feed and drain pipework

Installation of a mains cold water supply for flushing of the Adey magnetic filter Thermal insulation of all new and modified LPHW and mains cold water pipework Remedial thermal insulation to any existing insulation cut back or damaged by the works Installation of a new plantroom power supply isolator, plantroom distribution board, plantroom lighting, emergency lighting and double switched socket outlet all with galvanised steel cable containment

Installation of a new plant control panel for the boilerplant and the existing HWS plant Installation of field wiring for the new boilerplant

esting and commissioning

Reconnection of the field wiring to the HWS plant and testing

Clearing site

Provision of as fitted drawings and an operation and an operation and maintenance manual

Demonstration of the new boiler plant and services to the Trust’s Estates department

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender (tender) · e072dcd9-8983-4bf6-ac9b-75afd0e8727c-97013

more from Dorset HealthCare University NHS Foundation Trust

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.