The Jamestown Swimming Pool consists of two pools, namely a 33m (100 foot) long main swimming pool and a smaller paddling pool. The pool was constructed in 1979 by the Royal Engineers and opened in November of that same year. The actual swimming pool is still in good condition however the plant facility that operates the pool is past it’s shelf life and is in need of complete replacement. This tender looks to address this issue and extend the lifespan of the pool for at least a further 40 years.

The intention is to replace the plant facilities as well as piping to the pool with the exception of the pipework under the pool to increase the life expectancy of the pool operation.

The new solution should create reliability and consider low cost of operation in terms of utilities, operational maintenance, spares and consumables.

Additional information: For the additional Swimming Pool report and existing drawings and schematic please register interest with Noleen Herne the Corporate procurement Assistant (noleen.herne@sainthelena.gov.sh) and these will be issued directly.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender (tender) · c4f23293-0276-4361-8310-3b689ac390c4-96680

more from Saint Helena Government

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.