key details

Value£75,000
Statuscomplete
Category (CPV) 15910000 +1 more
Deadline12 Oct 2020
Contract start7 Dec 2020
Contract end15 Mar 2021
SME suitableYes
OCIDocds-b5fd17-1145c75b-f601-4e9b-8121-f9fe355f64e7

Awards (17)

This procurement was awarded to 15 suppliers. Values shown are per-award; the notice total is £75,000.

SupplierValueDateStatus
Bennamann ltd shared £46,620 24 Nov 2020 active
Colorado Construction & Engineering Ltd shared £74,768 24 Nov 2020 active
Colorado Construction & Engineering Ltd shared £72,637 24 Nov 2020 active
Cornish Geothermal Distillery Company Ltd shared £75,000 24 Nov 2020 active
Environmental Resources Management Limited (ERM) shared £68,951 24 Nov 2020 active
European Marine Energy Centre shared £58,781 24 Nov 2020 active
John Fergus & Co Ltd shared £71,813 24 Nov 2020 active
Locogen Ltd shared £43,325 24 Nov 2020 active
Protium Energy Limited shared £57,464 24 Nov 2020 active
Protium Green Solutions Limited shared £73,818 24 Nov 2020 active
St Andrews Brewers Limited shared £51,547 24 Nov 2020 active
Sunamp Ltd shared £61,413 24 Nov 2020 active
Supercritical Solutions Ltd. shared £53,000 24 Nov 2020 active
The Edrington Group Limited shared £56,930 24 Nov 2020 active
The Uist Distilling Company Ltd shared £44,572 24 Nov 2020 active
The Uist Distilling Company Ltd shared £40,539 24 Nov 2020 active
Vytok Ltd shared £57,688 24 Nov 2020 active

description

The supplier must undertake and report on a feasibility study into the development of innovative fuel switching or fuel-switch enabling technologies that are directly transferable to the distilleries sector (from malting to maturation).

Background

In the 2020 Budget, the Chancellor announced £10 million of new R&D funding to help decarbonise UK distilleries. This aligns closely with BEIS's wider innovation work to deliver on the government commitment to accelerate the commercialisation of innovative cheap, clean and reliable energy technologies, enabling the UK to meet net-zero.

The spirits sector is estimated to have a GVA of £8.25bn with Scotch whisky providing £5.5bn.1 £4.7bn was through exports, making up 21% of all UK food and drink exports.1

The production of whisky is around seven times more energy intensive than that of gin and directly produced around 530,000 tCO2e/y in 2018.2,3 The majority of these emissions come from the generation of heat for the distillation process, which accounts for approximately 83% of the distillation industry's fuel consumption.3 56% of the fuel used is natural gas.3 However, due to the remote location of some of the distilleries, the industry still uses a range of fossil fuels including medium/heavy fuel oil.

  1. https://www.scotch-whisky.org.uk/media/1591/final-2018-economic-impact-report.pdf accessed 20/7/20
  2. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/866363/Phase_2_-_EMEC_-_HySPIRITS.pdf accessed 21/7/20
  3. https://www.scotch-whisky.org.uk/media/1733/net-zero-pathways-report-june-2020.pdf accessed 20/7/20

Competition Details

The Green Distilleries Competition is to support the development of innovative fuel switching or fuel-switch enabling technologies that are directly transferable to the distilleries sector (from malting to maturation). It is to support the development of technologies that are not yet commercial rather than supporting ongoing decarbonisation across the distilleries sector. Therefore, the technologies to be developed must be at a technology readiness level (TRL) between 4 and 7 at the start of the project. The ultimate objective is to trial the technologies at pilot scale.

The aim of the Green Distilleries competition is to identify, support and then develop credible innovative fuel switching technologies/enabling technologies bringing about a step change in their development. The competition will be split up into two phases with Phase 1 focusing on an initial feasibility study, followed by Phase 2 which will support a pilot demonstration. Only those applicants who are successful in Phase 1 and have completed their feasibility study may enter into Phase 2. A separate application form will be released before the end of the Phase 1 feasibility study, which will be used to assess applicants for the Phase 2 demonstration study.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
12 Jan 2021 Award (award) · 5173c54d-48e4-4278-b1f2-74a6a0ba5100-405219

more from Business Energy and Industrial Strategy

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.