Provision of a Steelwork Clad, Portal Framed Building
key details
| Value | £400,000 |
|---|---|
| Status | complete |
| Category (CPV) | 44000000 +2 more |
| Deadline | 1 Nov 2017 |
| Contract start | 17 Apr 2019 |
| Contract end | 6 Nov 2019 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-1c241d09-5851-4a01-b161-147f4bb2359d |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Gow's Lybster Limited | £500,000 | 16 Apr 2019 | active |
description
Dounreay Site Restoration Limited (DSRL) is awarding a Contract for the manufacture and erection of a steel portal frame building and ancillary steelwork structures. The building is required to provide suitable support and protection for a shielded ADU Floc immobilisation process line which is to be built on the Dounreay site. The supporting ancillary steelwork structures include a pipe bridge, external fire escape and covered walkway.
The portal frame structure will fix directly to a 1m thick reinforced concrete foundation slab which will be constructed by others as part of the Civil Works associated with the new facility. The pipe bridge plinths and foundations required for the ancillary structures will also be constructed by others.
The main building structure is approximately 12m x 18m on plan with an eaves height of 10m and a roof pitch of 15°. The structure incorporates a 5 tonne runway beam along the full length of the building.
A 5m x 10m lean-to structure is also attached to the main building for storage and export facilities. This secondary structure is approximately 10m x 5m on plan with an eaves height of 4m and a roof pitch of 15°.
The structures are to be clad with insulated profiled metal cladding with a core thickness of 100mm and a fire rating of 30mins. The building includes 4 No. roller shutter doors and 4 No. fire escape doors.
The pipe bridge is of lattice beam construction, 45m in length and supported on 5 column frames all circa 6.5m in height. The spans between column supports vary between 19.5m and 4.0m. The external fire escape is a braced steel structure with dunbar flooring and the covered walkway comprises of a series of transverse steel portal frames clad in proprietary insulated profiled metal cladding.
documents
- https://sharedsystems.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=10112&B=DSRL , tenderNotice
- https://sharedsystems.eu-supply.com/ctm/Company/CompanyInformation/Index/9689 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/aab1750c-c52d-4348-a0e9-9e5f33be6264 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 2 Oct 2017 | Tender (tender) | · | aab1750c-c52d-4348-a0e9-9e5f33be6264-173558 |
| 18 Apr 2019 | Award (award) | · | 5d77be28-f85e-4e1d-b5fa-406a978e26e8-284875 |
more from Dounreay Site Restoration Limited
- Low Level Waste Pits Resurfacing and Provision of Cover Building · £200,000 · 26 Jun 2023
- SecureLink SaaS Licence and Maintenance Support Renewal · £35,702 · 18 Apr 2023
- Preparation of Research & Development Tax Relief Claim · £66,000 · 13 Apr 2023
- Services of a an Estimator · £80,000 · 11 Apr 2023
- Services of a Planner · £80,000 · 11 Apr 2023
- Supply of a Predator Arm · £103,850 · 6 Apr 2023
- Shaft & Silo Interim Exclusions · £29,371 · 29 Mar 2023
- Survey and Designer / Draughting Support · £91,060 · 23 Mar 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- ** Mini Competition ** George Stephenson High Water Main Replacement Phase 3 PRF 21-070 · NORTH TYNESIDE COUNCIL · £122,000
- **Mini Competition** Burradon primary School Heating Boiler Replacement · NORTH TYNESIDE COUNCIL · £122,000
- ** Direct Award ** Marden Estate Phases 1 & 2 - Roof Replacements · NORTH TYNESIDE COUNCIL · £1,430,000
- **Direct Award** Marden Estate Phases 1 & 2 - Scaffolding for Roof Replacements · NORTH TYNESIDE COUNCIL · £389,000
- C005PC St Botolph's Circus · Essex County Council · £7,185,203
- **Direct Award** - Backworth, Holystone & Castle Park - Kitchen and Bathroom Installations · NORTH TYNESIDE COUNCIL · £616,000
- RA357559 - Maintenance for mortuary equipment · University Hospitals of Derby and Burton NHS Foundation Trust · £12,617
- PR062025 - Fire Compartmentation & Fire Door Works · Exeter City Council · £1,458,804
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.