gvtcx

Enhancement of the Coventry Fire House training facility

West Midlands Fire & Rescue Published 21 Oct 2024 Contracts Finder

key details

Statusactive
Category (CPV) 45453100 +6 more
RegionWest Midlands
Deadline22 Nov 2024
Contract start20 Jan 2025
Contract end1 Apr 2025
Procedureopen
SME suitableYes
OCIDocds-b5fd17-a5ccfe14-3d82-459f-afbc-03d6a30b62bb

description

The project involves the enhancement of the Coventry Fire House training facility, which focuses on providing realistic training environments for firefighters, especially through scenarios involving carbonaceous material burns. To summarise the required works:

Key Enhancements:

  • oDrying Room Installation: A new facility for drying equipment and gear used during training exercises.
  • oDirty Lecture Room: Creation of a lecture/briefing room for use after training, where participants can enter without needing to clean up first.
  • oAlterations to Site Drainage: Adjustments to the existing external drainage system to connect to existing site drainage.
  • oExternal Staircase: Supply and fitting of a new external emergency escape staircase outside the building fitted to the existing gantry.
  • oDry Riser Installation: A dry riser will be installed to allow water to be delivered in the building, essential for high-rise training and firefighting scenarios.
  • oHigh-Rise Training Scenario: A scenario for high-rise firefighting training will be established, including an alternative door entry into an existing burn room to simulate realistic entry challenges.
  • oTemperature Probes: Installation of temperature monitoring devices to track and record heat conditions during training exercises.
  • oFabrication of Metal Doors and Partitions: Fabrication and fitting of robust metal doors and partitions to create confined spaces and more challenging entryways for firefighting drills.

Purpose of Enhancements:

These works aim to improve the overall functionality of the Coventry Fire House, making it a more effective and realistic training facility by simulating different firefighting conditions, especially high-rise building scenarios. The upgrades, such as the drying room and lecture room, will also support the operational needs of training participants.

Additional information:

A new project has been published to the website. Project: Coventry Fire House Refurbishment, Project Reference: C5703.

To connect with our national Bluelight portal we recommend you login or register at https://sell2.in-tend.co.uk/blpd/home and then connect to from the list of portals.

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
21 Oct 2024 Tender (tender) · 52797599-b2b7-4f59-9dd2-f35e7b4886be-795812

more from West Midlands Fire & Rescue

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.