gvtcx

Furness College Residences Project

Lancaster University Published 25 Jan 2022 Contracts Finder

key details

Value£1,300,000
Statuscomplete
Category (CPV) 45000000
Deadline22 Feb 2022
Contract start16 May 2022
Contract end26 Aug 2022
Procedureopen
SME suitableYes
OCIDocds-b5fd17-a54dd2c7-1fca-4a4c-88d6-f000293f63b6

Award

SupplierValueDateStatus
Parkinson Builders Ltd. £1,600,000 7 Jul 2022 active

description

To begin the bidding process for this project, please access the project through our e-tendering system, In Tend (https://in-tendhost.co.uk/lancaster/aspx/Home). Please complete the Selection Stage documentation, fill and return through the portal.

Please submit any clarifications prior to COB 15th February 2022 - we cannot guarantee a response to clarifications received after this date, although we will endeavour to answer any questions received.

Overview:

Furness College currently comprises college offices, reception, foyer, and bar to the A floor, offices to the B & C Floors, and roof top flats to the D Floor.

The scope of works is to convert the existing Furness College C Floor Offices into seven Apartments with between nine and ten bedrooms per Apartment block. The current RIBA Stage 2 proposal totals 65 bedrooms. Each bedroom will be furnished with a fitted bed, desk, and wardrobe, with individual Wi-Fi access point and data connection; whilst each flat will be fitted out with a communal kitchen/living space and shower rooms.

The provision of new kitchens, shower rooms and the inclusion of washbasins in each bedroom will require new Soil and Vent Pipes to be installed and connected to the existing foul drainage system below ground level. Core drilling through the concrete floor slabs will be necessary for the drainage systems to be commissioned and new pipe boxings, bulkheads, and false ceilings will need to be constructed on the A & B Floors. To limit disruption to the occupants of the B Floor, some staged completion and decanting of staff may be necessary.

New L2 fire detection and alarm systems will be installed to the Apartments.

The construction work is planned to take place during the summer of 2022 but the campus will remain live with staff and students still living and working around the site.

Construction cost estimate for the scheme is currently in the range of £1m to £1.3m.

There is no work to be completed in Bowland Annexe.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
28 Mar 2023 Award (award) · a1840bf2-a14b-40ec-a5eb-a949a2e2b307-628953

more from Lancaster University

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.