Title

Cladding and Sprayed Concrete

Design and planning of the works before physical works commence.

The Subcontractor is required to support the Contractor during the planning phase to ensure an optimum design and delivery of the asset.

To deliver the above the Subcontractor will, at least:

-Attend weekly progress meetings, and actively engage providing ideas and solutions.
-Provide constructibility report for the works.
-Provide programme for the works. Special attention to those elements that require long lead in i.e., procurement of pre-cast elements moulds, and therefore require early procurement/instructions.

For the Construction of the works

The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of cladding of the PRA OB pier piles, as described in the specifications, drawings, HS2 standards and other documents provided:

Pier Cladding Update- Performance Criteria

Options

Precast concrete 160 mm to 200mm thick discussed.

Steel sections bracketed to pile.

GRP sections fixed to outside of pile with compressible liner/ infill.

Formwork with pile wrapping and RC wrapping mesh/ rebar.

Design Criteria for finisher pier cladding.

Pier cladding noted on drawings 3200mm precast cladding 200 mm thick.

Maximum outside diameter = 3200mm.

Minimum inside diameter = 2800mm.

Arrangement allows for overall out of position of installed pile of 100mm maximum. Assuming 2600mm Dia pile cap.

Corbel support from pile designed to support self-weight of pier cladding.

Cladding to be isolated from pier architectural non-participating with respect to capacity of pile.

Differential movement to be allowed of minimum 10mm if fully infilled or grouted.

Potential to leave unfilled and sealed from water ingress at top.

Options for applying Cladding to uneven concrete pile.

Potential to use Steel shell.

Potential to use GRP cladding.

Height of Cladded Pile approximately 5m

Max SW cladding = 225 high density (25kN/m3 ) thick casing .

Shell with compressible layer/ foam infill to ensure non-structural.

Allowance has been made for grout infill if necessary but compressible layer required to isolate cladding from load effects.

Additional information: Currently No Specification - Supply Chain involvement in the Design required

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
5 Oct 2023 Tender (tender) · 6e7c674e-8286-4c4b-9f2e-44168bd95329-686341

more from Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.