Fire Safety Consultations - New Homes

BROMFORD HOUSING GROUP LIMITED Published 18 Apr 2024 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£600,000
Statuscomplete
Category (CPV) 75251110
Deadline28 Feb 2024
Contract start1 Mar 2024
Contract end29 Nov 2027
Procedureselective
SME suitableYes
OCIDocds-b5fd17-10cef106-0da2-4079-99ab-b97d3891a5b2

Award

SupplierValueDateStatus
Firntec Ltd £600,000 17 Apr 2024 active

description

This appointment is to provide fire assessments and consultation services to Bromford. To include but not limited to:

To read and comprehend any fire strategy documents and plan drawings that have been produce for, and on behalf, of the developer.
Prior to submission to the relevant building control authority make comments on the fire strategy in line with best practice and report these comments to the client.
To ensure the fire strategy document is compliant with the building design guidance being adopted for construction e.g. Approved Document B, BS 9991, or BS 9999.
To ensure that during the phases of building that you are influencing the Contractor/Developer to ensure all appropriate industry standard applications, processes and best practice are adhered to, especially-
ofire ratings for compartmentation.
ofire ratings for compartmentation penetrations.
ofire ratings for installation of fire doors, shutters, dampers and smoke control installations.
oFire rating and installation of any cavity barriers.
To be able to determine with BHA/BDL and the Contractor/Developer the suitability of any proposed-
ofire detection & alarm system,
osmoke control system,
oemergency lighting system,
oautomatic water suppression system,
olightning protection system,
oexternal wall façade system,
odry rising fire main installation.
To ensure that suitable access arrangements by way of inspection hatches are provided to allow for ongoing testing, servicing and maintenance of any building system.
To ensure that suitable photographic records are made of the phases of development including all fire stopping measures which become unseen on completion of works and provided to the client prior to the Practical Completion as defined under the building Contract.
To check on the competency of installers carrying out specialised works.
To refer to a suitable expert in the event of any aspect of work falling outside of the consultant's area of competence.
To liaise with Construction Managers, Project Managers and the Employers Agents to ensure that any identified shortcomings in works are made good to industry best practice. Any defective work should in respect of Fire Safety and adherence to plans ought to be reported to the Employers Agent with photographic evidence and suggestions for remediation copying in the CQM, and Project Manager as well as the wider Project Team of the Developer/Contractor.
To liaise with Bromford's Fire Safety Team of Fire Risk & Compliance Assessors at suitable times to enable a fire risk assessment to be carried out at, or near to, occupation of the building.
To inform Bromford of any changes of legislation that may impact the fire risk assessment outcome before completion of the building.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Apr 2024 Award (award) · 0a56390f-b922-4d7b-a865-a81c3ca036c4-742371

more from BROMFORD HOUSING GROUP LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.