Advance Northumberland Limited Published 3 May 2023 Contracts Finder

key details

Value£140,000
Statusactive
Category (CPV) 45100000 +1 more
Deadline26 May 2023
Contract start26 Jun 2023
Contract end18 Aug 2023
Procedureopen
SME suitableYes
OCIDocds-b5fd17-a355eb5e-8be8-4e54-b826-05277bef0716

description

Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires bulk material removal from 1 location within our development portfolio resulting from construction work.

Northumberland Energy Park, NEP1 - Former Blyth Power Station Site, Brock Lane, East Sleekburn, Cambois, Northumberland NE22 7BW

Estimated volume: 14,000 cubic metres.

The materials to be disposed of are construction and demolition waste arising from the dock excavation and construction works, including crushed concrete, fill from the time of the power station construction, infill from demolition and excavation of underlying natural ground materials and soil. The spoil has been placed in three separate stockpiles, named C2S, SSM1 and SSM2, which have been sampled for potential contaminants and Waste Acceptance Criteria (WAC) testing.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
19 May 2023 Tender (tender) · 4441b63c-4e39-41d2-895f-e6d7d6172f11-646666

more from Advance Northumberland Limited

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.