gvtcx

Sealing Deep Site Investigation Boreholes - Phase 5

CTM Portal for the NDA Shared Services Alliance Published 13 Jul 2021 Contracts Finder

key details

Value£9,500,001
Statusactive
Category (CPV) 38200000 +15 more
Deadline2 Aug 2021
Contract start1 Dec 2021
Contract end30 Nov 2026
SME suitableYes
OCIDocds-b5fd17-107b9bb8-d6f8-4195-84a5-00c226b0eafc

description

RWM's working model for the proposed procurement strategy is for a single contract award with a suitably qualified contractor to deliver Phase 5. This strategy may change based upon the outcome of this market engagement and further development of the procurement strategy. The contract will be for a period of 5 years with an option to extend this for a further 2 years.

A DRAFT Contract Technical Specification and Questionnaire can be accessed by registering on the RWM procurement tendering system here: Sellafield Ltd (eu-supply.com)

For background on the borehole sealing project, please see http://rwm.nda.gov.uk/publication/sealing-deep-site-investigation-boreholes-phase-1-report-rwmd03042/ (Phase 1 output) and

http://rwm.nda.gov.uk/publication/sealing-deep-site-investigation-boreholes-phase-2-final-report/ (Phase 2 output). Activities to be included in Phase 5 will consider 'small-scale' laboratory work on materials such as bentonite, 'large-scale' laboratory work (e.g. using 20m mock-up boreholes), natural analogues (currently progressing via a series of international collaborative projects), a continuation of work on bridge plugs (a collaboration between RWM and two international waste management organisations), field demonstrations in pre-existing boreholes up to 2km deep and in underground research laboratories.

No borehole drilling will be undertaken. However, preparing a borehole for sealing may require rehabilitation, removal of abandoned in-hole equipment, milling and under-reaming of a window in borehole casing, etc. - access to coiled tubing and drill string technology is anticipated. Bentonite has already been chosen as the seal material for use in boreholes in lower strength sedimentary rocks and higher strength rocks. Bentonite will be emplaced in boreholes in Phase 5 via use of the Downhole Placement System, a tool has been developed for this project. A different approach can be followed for a borehole penetrating an evaporite layer in Phase 5.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
13 Jul 2021 Tender (tender) · 4e18c79f-6b9c-4ac6-b435-9979fce33804-450983

more from CTM Portal for the NDA Shared Services Alliance

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.