gvtcx

QU152 - Green Book-compliant Full Business Case for Curzon Public Realm

Birmingham City Council Published 3 Aug 2018 Contracts Finder

key details

Statusactive
Category (CPV) 79415200 +3 more
RegionWest Midlands
Deadline17 Aug 2018
Contract start3 Sept 2018
Contract end31 Dec 2018
SME suitableYes
OCIDocds-b5fd17-9fdaa145-30f6-4efd-97c9-bb090dfaba30

description

Birmingham City Council requires a supplier for the provision of Green Book-compliant GBSLEP Funding Application for HS2 Curzon Station Public Realm projects.

In February 2014 the City Council launched the Curzon Masterplan as part of the wider HS2 Midlands Growth Strategy to maximise the economic impact of HS2.

The Masterplan set out how the arrival of HS2 and the growth and regeneration opportunities around the terminus station could be unlocked. Covering 141 hectares of the City Centre, with the area centred on the HS2 Curzon Station, the strategy of the Masterplan is to deliver a fully integrated and connected world class station, which will support growth and regeneration for the City Centre and wider area. This will be achieved through the delivery of five big moves:

  • oStation design to create a landmark building and arrival experience
  • oPaternoster Place
  • oCurzon Promenade and Curzon Square
  • oStation Square and Moor Street Queensway
  • oCurzon Station Metro stop

In September 2016 the Council approved the HS2 Curzon Station and associated public realm package, which included the allocation of additional EZ funding of ?0.564m towards phase one of the design of Paternoster Place, Curzon Promenade, Curzon Square and the Curzon Canalside. The package will be delivered in two phases:

  • oPhase One - Concept Design to select a single option for each project (April - July 2018)
  • oPhase Two - Scheme Design to RIBA 3 (July - December 2018)

An essential part of the design is delivering the 'Big Moves' that will integrate the station with the City Centre and unlock growth. The current HS2 programme indicates that the station design team will be appointed in early 2018 and a planning application will be early 2019. Construction will start in 2022 and be complete by 2025.

This contract will be for the period commencing on date of appointment until December 2018.

Registration and use of in-tend is free. All correspondence for this procurement process must be via the in-tend correspondence function. If you are unable to register with in-tend please either email us at cps@birmingham.gov.uk or call 0121 464 8000.

If you are interested in tendering please click on the following link to access the Council's tender Portal:-. https://in-tendhost.co.uk/birminghamcc/ and submit your details to register as a bidder. We will send you a log on and password so you can download the quotation documentation.

Your completed quotation documentation should be returned by noon on 17 August 2018 via the 'in-tend' system https://in-tendhost.co.uk/birminghamcc

Additional information:

If you are interested in tendering please click on the following link to access Birmingham City Council's tender Portal.

Delivery Notes

Birmingham

Is a Recurrent Procurement Type? : No

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
3 Aug 2018 Tender (tender) · 20c2bbf6-b2fd-4cab-b4a6-f1fd83f834d6-232756

more from Birmingham City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.