gvtcx

Palladium Permeators and Palladium Membrane Reactors

EU SUPPLY LIMITED Published 22 Oct 2024 Contracts Finder

key details

Statusactive
Category (CPV) 71323000 +31 more
Deadline28 Nov 2024
Contract start10 Mar 2025
Contract end11 Jan 2027
Procedureselective
SME suitableNo
OCIDocds-b5fd17-9e3787fd-4826-4169-b309-56f93edb284a

description

UKAEA wishes to procure the Design, analysis, manufacture, assembly, Factory Acceptance Testing, delivery, Site Acceptance Testing, plus support during the installation, Integrated Testing, and commissioning of 3-off palladium-silver permeators, 2-off palladium-silver membrane reactors, three-off recuperative heat exchangers, and four cooling coils for the Hydrogen Purification System to be supplied into the Hydrogen 3 Advanced Technology facility at UKAEA's Culham Science Centre. The requirement also includes the sourcing of one steam generator and one dosing pump for providing water vapour into the PMR, including detailed design of the associated lines and process equipment.

Designs are to be manufactured by the Contractor and must support and contain the process equipment whilst providing external process and Electrical, Control and Instrumentation (EC&I) connections.

The manufacturing, testing and delivery includes assembling all the process equipment fabricated/procured by the Contractor into completed permeators and PMRs for future installation by others into Gloveboxes. The Contractor/Supplier must undertake Factory Acceptance Testing to demonstrate the functionality of the permeator and PMR assemblies. Dedicated design reviews, and a full review of all design documentation shall be conducted by the Office of Chief Engineers (OCE) prior to any production to ensure the permeator and PMR assemblies meet the UKAEA requirements listed within the Tender pack. The Contractor/Supplier shall deliver the permeators and PMRs to Culham and complete Site Acceptance Testing, after which a third party will conduct the Installation, Integrated Testing, and commissioning with support from the Contractor/Supplier. Sufficient information shall be provided for inclusion within the technical file (LTQR) to support the overall conformity marking of the system.

The estimated duration of design, manufacturing, testing, and delivery is 22 months.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

2 notices published against this procurement.

PublishedTypeRegimeNotice
22 Oct 2024 Tender (tender) · f0f57ed0-7fa9-4731-8ff2-3e5ae41c4aa2-796224
22 Nov 2024 Tender amendment (tenderAmendment) · f0f57ed0-7fa9-4731-8ff2-3e5ae41c4aa2-805130

more from EU SUPPLY LIMITED

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.