Dam Works for Swallow Moss Complex, Warslow Estate, Staffordshire
key details
| Value | £284,000 |
|---|---|
| Status | complete |
| Category (CPV) | 90700000 |
| Region | East Midlands |
| Deadline | 20 Sept 2019 |
| Contract start | 17 Aug 2020 |
| Contract end | 31 Dec 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-9dadf7a9-d613-4eda-a10f-edd345bc6980 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Terra Firma Environmental Ltd | £296,329 | 13 Oct 2019 | active |
description
Please refer to attached Map. 1 which shows the location of proposed blocking works on the swallow moss complex which is part of a wider SSSI, SPA and SAC designation. The area shown is owned and managed by the PDNPA and covers c.260 hectares, there are five individual blocks of land that make up this area and include; Swallow Moss, Averhill side, Lum Edge, Revidge, and Moorside.
Wet heath covers much of the area with dry heath predominantly on higher areas of ground, important mires, flushes and scrub are also present (Map 2). The moors are crossed with primary and secondary watercourses, and in places groundwater emerges on slopes and wetlands and flushes have developed. The area supports a range of birdlife including upland breeding waders such as snipe and curlew.
The moors are currently rented out on a variety of grazing licenses and tenancies, and grazed with cattle during the summer months. The area has been subject to a detailed hydrological survey and a number of 'watercourses' have been identified for hydrological works, see Map 5 & 6 and the accompanying spreadsheet. These have been selected based on site visits and consultation with NE staff.
The Authority is seeking tender returns for the full implementation of the Works for inclusion within a Higher Tier stewardship agreement with the intention being to undertake works during 2020 and 2021
Additional information: Note for tenderers: Please note that at Appendix 4 (itemised cost), the Year 2 element does not have a separate peat/clay dam construction field to complete. Please add to the 'any additional items'. This is an expanding box for you to add anything else that you feel is necessary.
documents
- https://www.contractsfinder.service.gov.uk/Notice/813b6234-67bd-4732-83cb-cd5f57adc16a , tenderNotice
- https://www.peakdistrict.gov.uk/looking-after/about-us/open-government/tenders , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 22 Apr 2021 | Award (award) | · | 391ddf29-2dfd-47ee-952a-3b3311bf56f5-430779 |
more from Peak District National Park Authority
- Digitisation Project 2025 · £60,000 · 20 Feb 2025
- Security tender 2025-2028 · £26,000 · 4 Feb 2025
- Bracken management and habitat restoration (Callow prehistoric settlement) Carr Head Moor · £20,000 · 20 Dec 2024
- MFF 158 2024-25 Aerial load lifting for moorland restoration · £30,000 · 4 Dec 2024
- Internal Audit Tender PDNPA · £72,000 · 20 Nov 2024
- 'Morridge Hill Country' Peatland Survey Tender · £32,000 · 15 Nov 2024
- Re-surfacing circa 2380m of footpath on the High Peak Trail, Hurdlow Car Park · £40,000 · 11 Nov 2024
- Refurbishment works to campsite amenity building · £25,000 · 25 Oct 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- The Provision of Ecology Services · Loughborough University
- Provision of Wastewater Quality Testing Service · Armagh, Banbridge & Craigavon Borough Council
- Biodiversity Net Gain (BNG) · NORTHUMBRIAN WATER LIMITED · £5,700,000
- SAMM (Strategic Access Management & Monitoring) for the Wealden Heaths Phase II Special Protection Area (SPA) · East Hampshire District Council · £432,000
- Production of seabird flight height distributions from at-sea laser rangefinder data · JNCC SUPPORT CO · £28,000
- Natural Capital Baselining on Glenlivet Estate · Crown Estate Scotland · £472,143
- Strategic Flood Risk Assessment and Water Cycle Study · Borough Council of Kings Lynn and West Norfolk
- National Marine Plan 2 (NMP2) Social and Economic Impact Assessment · Scottish Government · £8,834
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.