gvtcx

Aluminium Cladding C4 - KCSL

Kilnbridge Construction Services Ltd Published 23 Oct 2024 Contracts Finder

key details

Value£10,000,000
Statusactive
Category (CPV) 45262650 +2 more
RegionLondon
Deadline5 Nov 2024
Contract start1 Jun 2025
Contract end30 Jun 2028
SME suitableNo
OCIDocds-b5fd17-9ce16277-91e3-445a-92e5-53c116c6d4ea

description

Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for construction of the Headhouses and Ancillary Buildings. Part of the scope requires the supply and manufacture of bespoke architectural & Standing seam Aluminium, including associated rainwater systems to numerous satellite buildings around the station complex. Those buildings include the following:

North Portal
East core
Cycle hub
Train crew and catering building
Number of smaller vent structures

The package includes a range of panel profiles, folded sections, interfaces and will include a range of different specification and performance criteria such as:

-Various panels with folded edges to form a 3-dimensional elevation.
-Bull nose cladding
-Soffit panels (with hinged details)
-Radius rainscreen panels
-Copings (including radius)
-Skirtings (stainless steel & Aluminium) with various finishes
-All the above in various lengths and shapes (circa 2m-9m and above)
-Various material thickness
-Anodising
-Polyester powder coated
-Welded stiffeners and joints
-Secondary support system
-Security specifications
-Fire specifications (meet the requirements of the Fire engineer's documentation as minimum)
-Acoustic & Thermal performance requirements
-Any other standards or specifications required by the employer
-Any ancillary items bracketry etc where required. This includes all openings including additional supports around the openings. Works include also mock ups, samples and quality benchmarks.

The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for manufacture, supply and testing of the various cladding and rainscreen cladding panels and ancillary items.

The Subsubcontractor will be responsible for progressing the schedule and associated detailed drawings for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.

Quantity - circa 800m2 +

Expected Subsubcontract award Jan 25

Construction is to be carried out over a 2.5-year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
23 Oct 2024 Tender (tender) · dd2342c9-3140-4782-83ab-0fa784e80072-796302

more from Kilnbridge Construction Services Ltd

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.