Net Zero power and hydrogen: capacity requirements for flexibility
key details
| Value | £70,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73000000 |
| Deadline | 25 Jan 2022 |
| Contract start | 14 Mar 2022 |
| Contract end | 23 May 2022 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-9c651e77-d9cc-488e-9c7a-c20199c2235f |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| AFRY MANAGEMENT CONSULTING LIMITED | £69,936 | 4 Feb 2022 | active |
description
The Climate Change Act sets legally-binding targets for the UK's greenhouse gas emissions. It includes a 2050 target for Net Zero emissions by 2050 compared to 1990 levels, and a series of five-yearly carbon budgets towards that 2050 target.
In 2020 the CCC advised the Government that the Sixth Carbon Budget, covering the period 2033-37, should be set at 78% below 1990 levels. And that the UK's Nationally Determined Contribution (NDC) to the UN global process should be a 68% reduction in greenhouse aas emissions below 1990 levels by 2030.
The Government have accepted both these recommendations, and legislated the Sixth Carbon Budget in June 2021.
Underpinning the CCC's advice on the Sixth Budget and the NDC was a set of scenarios for emissions from electricity generation to 2050. These informed a recommendation to Government, as part of the advice, that use of unabated gas for electricity generation should be phased out by 2035 - meaning all electricity generation would be low-carbon from that date. In its Net Zero Strategy the Government have now adopted that target.
A core duty of the CCC under the Climate Change Act is to publish an annual report for Parliament monitoring progress towards meeting carbon budgets.
The CCC has previously developed a set of tracking indicators to monitor progress on an annual basis. For the 2022 Progress Report the CCC will be refreshing these indicators, in light of the new Net Zero and Sixth Carbon Budget targets.
As part of this process the CCC would like to produce new indicators focusing on the capacity deployment pathway for schedulable low-carbon generation and for other sources of flexibility, including interactions with the production of hydrogen.
**** See Specification for more detail ****
documents
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/21e842f6-7eca-4bf3-9a9d-91dfc113ef05 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/443bda74-d5d7-494d-9a0c-33e195db8b07 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/6d2758c5-8b54-4cf5-9de1-0a5928dc201a , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/b294807a-51c7-47b5-928c-a0b264fdec98 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/eb758d7b-337c-457d-a21d-902e00c22259 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/b31334fa-4974-4717-8bd4-4e1e0e37bb74 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
more from The Committee On Climate Change
- Scoping study to assess the resilience of the UK's cold supply chain to rising and extreme temperatures · £80,000 · 17 Apr 2024
- Developing spatial indicators of vulnerability to the impacts of climate change in the UK. · £50,000 · 4 Mar 2024
- Residential Buildings Assumptions · £41,500 · 18 Jan 2024
- Early engagement notice - Risks to health and the health service due to extreme heat · 18 Jan 2024
- Early engagement notice - Heat risks to the urban environment and health · 17 Jan 2024
- Early engagement notice - Interventions for building economy-wide water resilience · 10 Jan 2024
- Early Engagement Notice - Assessment of climate risks to UK cold-supply chains · 13 Dec 2023
- Climate Change Risk Assessment 4 - Technical Report · £500,000 · 7 Dec 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PS26168 - Audit of internet services · UK SHARED BUSINESS SERVICES LIMITED · £200,000
- Provision of Value of a Life Year Research (VOLY): Lot 4 Peer Review · DfTc - Department for Transport · £74,008
- Evaluation of Growth Gateway and Manufacturing Africa · Foreign Commonwealth and Development Office · £449,112
- PR 07 2026 Consultation and Engagement Research · Exeter City Council · £175,200
- Annual Awareness Survey and Stakeholder Sentiment Survey · Care Quality Commission · £62,188
- Provision of Accelerating AI-Enablement at the GCA · GOVERNMENT COMMERCIAL AGENCY · £98,000
- PS26116 - OfDIA Cyber Security Consultancy · DSIT
- PS26175 - Evaluation of DSIT Carbon Offsetting Consultancy · UK SBS
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.