Dry Dock Pumps
key details
| Value | £88,000 |
|---|---|
| Status | complete |
| Category (CPV) | 42110000 +1 more |
| Deadline | 5 Jul 2024 |
| Contract start | 15 Jul 2024 |
| Contract end | 30 Oct 2024 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-9b34101d-a379-4152-bab8-7e76b533e940 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| No supplier appointed as result of this tender | £0 | 23 Aug 2024 | active |
description
Penzance Dry Dock (PDD) is famously steeped in history, currently being the oldest operational dry dock of its type in Europe but requires drastic investment after decades of neglect and dilapidations.
While the surrounding shipyards, across the county and country have seen investment, PDD has slipped through the net time and time again.
As part of this refit, PDD wishes to replace our current pumping system to the dry dock with a new one, moving away from conventional pumps and motors above the water line.
Currently, the pumps we have, have two 45kw motors. PDD does not wish to exceed the current amperage draw on start up by any newly installed motors.
The key objectives are:
- To replace the current aged pump system, estimated to be installed 40 to 50 years ago and to install a new modern pumping system to the dry docks that will considerably improve the efficiency of the emptying of the dry docks. The current operational time from full to empty is approximately 4 hours with 2 pumps.
Capital investment, part-funded by the UK Government through the UK Shared Prosperity Fund,
Additional information: Clarifications will be published against the Contract Notice on Contracts Finder.
If interested in tendering for this project please ensure you add a "watch this notice" for alerts as from time to time additional information or clarifications may be published related to this tender.
It will be the responsibility of Bidders to ensure they are aware of all published clarifications and ensure that their bid has taken these into account.
documents
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/006bf808-2de9-4de0-bc28-4f09a1f4a554 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/059cffac-970b-4d89-a7de-7be7c5191e06 , biddingDocuments
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/2bc6411f-ca2e-4d54-86ad-19d6aa78f8a1 , clarifications
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/2e7eedf2-fb3a-42ef-afc8-e210ae2058d4 , illustration
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/5503145c-ab41-4bef-b551-f2bc05943133 , contractSchedule
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/5d50c39d-35a6-419a-98f7-d06cd1eb478e , technicalSpecifications
- https://www.contractsfinder.service.gov.uk/Notice/Attachment/f3ae07af-53ba-4c2d-b6d1-ec9d3e348bca , clarifications
- https://www.contractsfinder.service.gov.uk/Notice/ffbf9189-1c57-4526-b525-1eda2041e26b , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
3 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Jun 2024 | Tender (tender) | · | ffbf9189-1c57-4526-b525-1eda2041e26b-757642 |
| 20 Jun 2024 | Tender amendment (tenderAmendment) | · | ffbf9189-1c57-4526-b525-1eda2041e26b-761047 |
| 24 Aug 2024 | Award (award) | · | fa9e682c-3077-4f93-b12a-3da9146806c2-780249 |
more from PENZANCE DRY DOCK (2009) LIMITED
- Supply, installation and commissioning of Workshop Doors · £55,000 · 18 Jan 2025
- Compressor and air ring system · £55,000 · 13 Nov 2024
- Structural Groundworks and site modifications · £250,000 · 22 Oct 2024
- Office Roof Replacement Works · £75,000 · 24 Jun 2024
- Lifting Equipment : Supply, installation and commissioning of cranes · £940,000 · 22 May 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PURCH2558 Provision of Replacement Motor · University of Glasgow
- supply of an Avtur fuelled Capstone C30 Micro-Jet Turbine and its containerisation, suitable for operation in the Antarctic conditions expected at Halley Station · UK SHARED BUSINESS SERVICES LIMITED · £110,578
- Containerised Capstone C30 Avtur unit for BAS · UK SHARED BUSINESS SERVICES LIMITED · £110,071
- Maintenance of Power Turbines, Gas Turbines and Alternators at Greenwich · Transport for London · £9,200,500
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.