One off plumbing repairs

Medicines and Healthcare Products Regulatory Agency Published 26 Apr 2016 Contracts Finder

key details

Value£12,000
Statusactive
Category (CPV) 45332000
RegionEast of England
Deadline10 May 2016
Contract start1 Jun 2016
Contract end30 Jun 2016
Procedureopen
SME suitableYes
OCIDocds-b5fd17-97b6a6ee-adc9-11e6-9901-0019b9f3037b

description

We have a requirement for a one off repair of a water leak in one of our laboratories. The work will be planned to take place some time in June when the lab has been vacated.

The work would consist of; supply and installation of an 80mm pipe run to replace a leaking stretch of 76mm marine brass condensate return pipe; Connection to existing services; thermal insulation of same pipe; installation of duplex valves to allow isolation; civil works to enable installation and make good; removal of redundant pipework leg.

Below is an extract from our engineers report:

"A number of potential solutions have been investigated and discussed. It has been agreed that it is not a practical option to attempt a local repair. We can see no other option, but to re route the pipework, and with the room ceiling space being so congested and access being a H&S issue, the only way appears to cut and take the condensate pipe straight up through the roof, and run it across the boiler house roof externally, and drop it back into, and reconnect back in the Boiler House, in to the existing service. This would mean cutting through the roof, in two places and making good afterwards, to prevent ingress of rainwater, matching existing roof coverings.

All pipework would need to be thermally insulated afterwards. External insulation would need to be weatherproof.

Ideally, at this time, I recommend that we take this opportunity to get the contractor to fit some isolation valves on the condensate return pipework in the Boiler House, so that each leg can be individually isolated. This would mean that in the future, should any issues occur with the condensate system, then a complete site wide steam shutdown would be avoided, which would improve business continuity as a minimum.

A further requirement would be to remove all redundant existing brass marine pipework (hangers/bracketing etc) from office ceiling space, plant room void areas and boiler house, making good penetrations through walls, with fire stopping materials. "

To arrange a site visit to prepare a quotation please contact our Operations team on 01707 641 1374 or 01707 641 379

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
18 Nov 2016 Tender (tender) · 87fcc305-116d-41e6-84d6-39493c645d61-94895

more from Medicines and Healthcare Products Regulatory Agency

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.