ACCESS ROAD IMPROVEMENTS AT MULL OF KINTYRE LIGHTHOUSE, CAMPBELTOWN
key details
| Value | £566,055 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 +1 more |
| Region | Scotland |
| Deadline | 2 Mar 2023 |
| Contract start | 28 Mar 2023 |
| Contract end | 1 Aug 2023 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-97c6404d-95d2-4e7b-bdb4-b1659fbd36a0 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Trac International Ltd | £566,055 | 27 Mar 2023 | active |
description
Works for complete or part construction and civil engineering work. Landscaping work for roads and motorways. Construction, foundation and surface works for highways, roads. Ground-drainage work. Water tanks. The Mull of Kintyre Lighthouse was built in 1788 and re-built between 1821 and 1830. The lighthouse (located approximately 16miles south west of Campbelltown) is situated on the edge of an 80m high cliff and is accessed via a steep and twisty single track macadammed road. The private road is approximately 1 mile long and extends from a lockable timber gate, adjacent to a public carpark/turning area at the end of the of the unclassified local authority road. From the access gate at the public carpark, the road drops approximately 280m down to the lighthouse, via a number of tight hairpin bends.
Summary of Works:
- Remote site, Private Road, 1.2miles, 2.6m wide, few passing places extreme gradients, hairpin bends
- Existing private road surfacing is aged and breaking up at several points with poor condition drainage
- Known difficulties with large vehicles travelling on single track - access requires to be monitored
- Existing single track road is currently passable with care however major upgrade works are required.
- Proposed to make bulk deliveries using ship and helicopter.
- Temporary Power Supply for duration of the works, Site Security in accordance with CDM Regs. 2015
- Site clearance and works including demolition, excavation, drainage, earthworks, roadworks, brickwork,
- Stonework, metalwork, plumbing including removal of 3,500 litre cold water storage tank,
- Supply of and laying polymer concrete drainage channel, full road construction including overlay,
- Supply and installation of replacement stainless steel water tank and all fixings and fittings
- Supply and installation of 2no. 5,000 litre cold water storage tanks
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 28 Mar 2023 | Award (award) | · | 9f39156f-3eff-44e4-8e6e-aee708a25d9d-628642 |
more from Northern Lighthouse Board
- Ship Classification Survey Block Fee · £57,000 · 5 May 2026
- Marine Gas Oil - NLV Pharos · £33,327 · 1 May 2026
- E-Procurement Portal · £83,850 · 26 Jan 2026
- Heat Exchanger · £37,181 · 19 Mar 2025
- Office Cleaning Edinburgh · £140,820 · 22 Jan 2025
- Plate Heat Exchanger · £45,880 · 19 Dec 2024
- Fuel Quote - NLV Pharos - 5 November 2024 · £34,223 · 4 Nov 2024
- Mobile Voice and Data · £32,100 · 11 Oct 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PLACE1266H MHA PSP4 Agency Staff - S278 Street Lighting Support Scheme (2026 2027) · Derbyshire County Council · £80,000
- ENQ1310 - 2026-27 Structures Programme Assistance · DERBY CITY COUNCIL · £25,000
- CPU 7199 - Newstead Abbey MEND repair programme Quantity Surveyor · Nottingham City Council · £38,665
- CPU 7275 - Newstead Abbey MEND Repair Programme Conservation Accredited Lead Advisor · Nottingham City Council · £68,996
- Tickford Park Primary School SEND Unit · Milton Keynes Council · £101,188
- Cleeve and Yatton Small Transport Hubs · North Somerset Council · £116,495
- Lowca Community School - Damp remediation works · Cumberland Council · £47,080
- L9-102 ATE Monument Roundabout · North Lincolnshire Council · £198,564
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.