Gas Infrastructure Project Phase 2 works
key details
| Value | £300,000 |
|---|---|
| Status | complete |
| Category (CPV) | 45000000 +1 more |
| Region | North West |
| Deadline | 11 Jun 2021 |
| Contract start | 9 Aug 2021 |
| Contract end | 24 Sept 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-97564ab3-466e-49d2-b500-fbc805fe9587 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Tilbury Douglas Engineering Ltd | £694,491 | 11 Jul 2021 | active |
description
The University is inviting tenders on the terms set out in the ITT.
The Spine Service Duct at Lancaster University was originally constructed in the mid 1960's and contains multiple services to facilitate interconnecting buildings. The Main Duct is approximately 1 kilometre long, and is sub divided into two equal halves, North & South. The Duct is also a designated confined space. The Main Duct interlocks with approximately 20 No. sub ducts, each sub duct forms a service entry into the associated buildings. The Duct system equates to approximately 2100 metres in total. The University commissioned a DSEAR risk assessment, and subsequently the Natural Gas Infrastructure is undergoing a replacement/upgrade programme.
This Phase 2 project involves the replacement of RAG rated aging gas infrastructure with stainless steel gas pipework and fittings, located within the sub ducts and also underground works required outside of the duct. The majority of the works is located in a designated confined space, but there is also the need for excavations with the installation of MDPE gas pipe and by pass arrangements and as such the Contractor will have to be fully aware of the restrictions and constraints that this will put upon the project. The project has been designed in a way to ensure downtime and loss of service to existing supplies are minimised, particularly to accommodation blocks which are occupied all year round and this requirement needs to be fully understood by the Contractor.
The University is adopting a phased approach ensuring the Spine Duct and sub ducts continue to be compliant with legislation. Further work packages will be developed for future phases.
The location of the site is Bailrigg Campus, Lancaster, LA1 4YW.
This tender is not lotted. One contractor will be awarded the full package of work.
The University will host accompanied site visits on Thursday 20/05/21 and Friday 21/05/21. Please register your intention to attend via the In-Tend 'correspondence' function by 10am Tuesday 18th May 2021 at the latest as you will be allocated a time slot. The University will only host site visits on Thursday 20/05/21 and Friday 21/05/21 as a Confined Spaces Rescue team will be in attendance.
Please refer to the procurement documents for full details: Available free of charge via the University's e-tendering portal: In-Tend https://in-tendhost.co.uk/lancaster/
DOCUMENTS MUST BE ACCESSED AND SUBMISSIONS MADE VIA THIS PORTAL.
Any clarifications on procedure, documentation or the project generally must be raised through the In-Tend 'correspondence' function.
In-Tend Support:
Phone: 0845 557 8079
E-mail: support@in-tend.com
Web : https://in-tendhost.co.uk/lancaster/aspx/Help
documents
- https://www.contractsfinder.service.gov.uk/Notice/66b45e59-92ac-49b7-8ba2-2d55846f000a , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 23 Jul 2021 | Award (award) | · | e8049cd7-2672-4a0d-bda5-5bbcf4926b13-454368 |
more from Lancaster University
- Cryosystem for XRD · £64,750 · 18 Feb 2025
- NIRS Neuroimaging System · £300,000 · 27 Sept 2024
- Purchase of 2 Walk in Growth Rooms to be Integrated with Plant Phenotyping Equipment · £557,000 · 11 Dec 2023
- General Building Works Framework · £2,000,000 · 31 Oct 2023
- Hard Landscaping inc. Civil Engineering Works Framework · £200,000 · 23 Oct 2023
- Lancaster University Flooring Framework · £125,000 · 14 Jul 2023
- LUMS Refurbishment (Phase 2 East) 2023 · £15,800,000 · 16 Jun 2023
- The Ruskin Museum & Research Centre UMA Refurbishment Project · £5,000,000 · 8 Jun 2023
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Fire Remedial Actions · The Royal Borough of Kingston upon Thames · £2,200,000
- CPU 7394 - Housing Water Treatment (Legionnaires Bacteria Control) · Nottingham City Council · £840,000
- White Hall Residential New Build · Bristol City Council · £6,966,000
- Wooler School Refurbishment · Northumberland County Council · £3,350,000
- MPS Fire Escape Stair Works · METROPOLITAN POLICE SERVICE · £437,602
- Lambeth Red Labs Refurb-Upgrades AHU12&14 · METROPOLITAN POLICE SERVICE · £265,725
- Lambeth Red Labs Refurb-Upgrades AHU12 · METROPOLITAN POLICE SERVICE · £589,197
- Bexleyheath MPS - Chiller replacement · METROPOLITAN POLICE SERVICE · £434,544
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.