Brewery Turnback - ES6-8 Civil Engineering
key details
| Value | £1,000,000 |
|---|---|
| Status | active |
| Category (CPV) | 45200000 |
| Region | North West |
| Deadline | 13 Oct 2025 |
| Contract start | 18 May 2026 |
| Contract end | 31 Jul 2026 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-9689bce4-6822-43cd-a402-5a3db4050506 |
description
Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.
At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.
The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.
As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.
The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.
ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.
Ancillary Civil Engineering Scope of Work:
The supply and installation of the new infrastructure. This includes, but is not limited to, the following: new cable trough route, new signal foundations, new LOC foundations, ARMCO barriers, fencing, ducting system, and URX system. This includes all handback deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=100777625 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/9f791490-ed70-4330-8333-c8679e0531ff , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 7 Oct 2025 | Tender (tender) | · | 9f791490-ed70-4330-8333-c8679e0531ff-867040 |
more from Kier Infrastructure and Overseas - CP7 NWC
- Oldfield Road - Telecoms · £250,000 · 22 Oct 2025
- Oldfield Road - E & P Works · £1,000,000 · 22 Oct 2025
- Brewery Turnback - ES6-8 Devegetation Works · £50,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 E & P Works · £100,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 M & E works · £100,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 OLE Civilis / Foundations Works · £5,000,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 OLE Infrastructure · £5,000,000 · 7 Oct 2025
- Brewery Turnback - ES6-8 Permanent Way · £2,500,000 · 7 Oct 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Pickering Road Concrete Repairs · Hull City Council
- COV-Cycle Routes · Coventry City Council · £3,400,000
- Day Works Civils · VIA EAST MIDLANDS LIMITED · £4,000,000
- Highways Structures Programme · Cheshire west and Chester Borough Council · £21,000,000
- 18/1183 DA01 Cooper Park Improvements · Moray Council · £18,200,000
- Conversion of a former Bank to Library Hub · Launceston Town Council
- Newry, Mourne & Down District Council Civil Engineering Minor Works Framework Agreement 2025-2029 · Newry Mourne & Down District Council
- Orchard Park Footpath Improvements Phase 4 · Hull City Council · £250,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.