Refurbishment of Mechanical and Electrical Systems Contract 3

London Borough Of Lambeth Published 16 Jul 2015 Contracts Finder

key details

Value£2,269,520
Statusactive
Category (CPV) 45000000
RegionLondon
Deadline21 Aug 2015
Contract start8 Nov 2015
Contract end31 Mar 2016
SME suitableNo
OCIDocds-b5fd17-969d7e99-adc8-11e6-9901-0019b9f3037b

description

Heating and Hot Water Works at Hurst Street Estate (Herne Hill House and Park View House)

Removal of the existing central LTHW plant, distribution pipework, and in-dwelling heating and hot water systems. Installation of new central plant and a new 2-pipe distribution system to serve each dwelling, together with new Heat Interface Unit within each dwelling and new in-dwelling heating and hot water systems.

Pressure booster pumps are to be installed in the cold water down service. Existing in-dwelling cold water storage tanks are to be removed and the existing cold water pipework shall be re-fed from the boosted Cold Water Down Service. The existing in dwelling DHW pipework is to be retained and re-fed from the new HIU. An allowance shall also be made for installation of a LTHW buffer vessel in each boiler room if required to enable the boilers to serve the increased peak demand of the HIU installation.

  • Heating and Hot Water Works at Eastman House

The existing communal central boiler plant is to be retained and a new 2-pipe LTHW distribution system is to be installed from the boiler room to each dwelling, incorporating new run/standby circulation pumps. A new Heat Interface Unit (HIU) is to be installed in each dwelling to provide heating and domestic hot water. The existing heating pipework and radiators in each dwelling are to be fully renewed. Pressure booster pumps are to be installed in the cold water down service. Existing in-dwelling cold water storage tanks are to be removed and the existing cold water pipework shall be re-fed from the boosted Cold Water Down Service. The existing in dwelling DHW pipework is to be retained and re-fed from the new HIU. An allowance shall also be made for installation of a LTHW buffer vessel in each boiler room to enable the existing boilers to serve the increased peak demand of the HIU installation.

  • Smoke Extract Works at Hurst Street Estate (Herne Hill House and Park View House)

Replacement of the existing smoke extract fan units, control panels and associated electrical installation within each building.

The successful supplier must be able to comply with all requirements as set out in parts A – E and all appendices of the tender documentation.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
16 Jul 2015 Tender (tender) · ocds-b5fd17-969d7e99-adc8-11e6-9901-0019b9f3037b-69451-sd-c3

more from London Borough Of Lambeth

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.