GB-Chertsey: Ramp Demolition and Creation of Car Parks - Quantity Surveyor / Cost Advisor Service

ASPH NHS Foundation Trust Published 16 Jun 2017 Contracts Finder

key details

Value£25,000
Statusactive
Category (CPV) 71244000 +1 more
RegionSouth East
Deadline30 Jun 2017
Contract start4 Sept 2017
Contract end14 Jan 2019
SME suitableYes
OCIDocds-b5fd17-b0cc81ad-2363-4c0e-bf9e-3a540f503f77

description

NOTE: This notice was updated on 16 June 2017 for the following reason: Inclusion in Contracts FinderThe Ramp buildings date back to the1940s and are temporary buildings. These buildings are well beyond their anticipated life span, and have been identified in the Trust 6 Facet Survey as Poor / requiring high cost investment and are energy inefficient. Due to the complexities of demolishing the entire Ramp, the Ramp has been designated in two sections: Upper and Lower Ramp. The Lower Ramp was demolished in 2011/12, and the space was used to create a staff car park.

Ashford and St Peter's NHS Foundation Trust (The Trust) now wishes to demolish the Upper Ramp and create space for the Trust future developments. The proposed works involves the careful demolition of Block 46, 50, 51, local Boiler Plant room and associated ramp corridor. It also includes services diversion for Bock 54, Asbestos removal, construction of car parks, provision of works compound and an access route for the new Urgent Care and Assessment Block, together with improvement of the road network.

Scope of the project

•Provision and maintenance of utilities to Block 54 until 2020/21;

•Diversion of all services currently routed through the Ramp;

•Demolition of Block 46, 50, 51, local Boiler Plant Room and associated ramp corridor as far as the fire doors in the corridor linking Level 2 DOK and PEW; •Grading of the released land and formation of a new 90-spaces tarmacked visitor car park;

•Levelling the sloped green area in the main staff car park and creating a new design staff cark park with reallocated spaces;

•Closure of Hazel Car Park at the end of this project; this car park will be used as a contractor works compound for building the new UCAA Block; •Additional external lighting.

Please refer to the attached project brief for more details.

The Trust wishes to procure a design team that will be constituted at the discretion of the Lead Designer in order to provide the following services for planning, design, demolition and building works delivery: Structural Engineer, Mechanical Engineer, Electrical Engineer, Transport Engineer / Car Parking Consultant.

Please send the expression of interest to the email address provided

mark.lukose@asph.nhs.uk

Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

Please email the Expression of interest to the Email Address provided below

mark.lukose@asph.nhs.uk

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

3 notices published against this procurement.

PublishedTypeRegimeNotice
16 Jun 2017 Tender (tender) · a1b5a962-4f02-4ad3-8e27-66f092302ce7-154950
16 Jun 2017 Tender (tender) · 51b9dd21-28c2-4629-ac10-6cfb37fc18a5-154972
19 Jun 2017 Tender (tender) · 8af39dae-f956-4270-a2c7-e7efcc20a3b9-155333

more from ASPH NHS Foundation Trust

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.