gvtcx

HMS Warrior Rewire

Artelia Group Published 9 Oct 2018 Contracts Finder

key details

Value£200,000
Statusactive
Category (CPV) 45311000 +6 more
RegionSouth East
Deadline21 Nov 2018
Contract start3 Jun 2019
Contract end20 Dec 2019
Procedureopen
SME suitableYes
OCIDocds-b5fd17-9263d065-9b24-4c4f-9f53-a64237ee2292

description

The National Museum of the Royal Navy look after the largest fleet of historic warships in the world. Having taken ownership of HMS Warrior in July 2018, it was evident that the ship needed a full redesign and rewire of its current electrical system. The ship and its systems host a staff presence 24/7 all year and paying members of the public to the Historic Dockyard. Evening meals and events all take place throughout the year, supported by a cafe and a fully equipped professional kitchen. Alongside this public-facing role, the ship maintains numerous systems - macerator, speaker, fire detection, lighting and heating - as well as power for maintenance tools and equipment.

The aim of this project is for a full redesign and install of a new electrical system from the shore-side and on the ship. The purpose of this project is to create a system which is safe and supports the current and future power requirements of the NMRN on the ship.

The anticipated timeframe for this project is;

  • Autumn 2018: Tender process
  • Design: Summer 2019
  • Removal of redundant wiring and install: September 2019 - (Q3 - 4)

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
31 Oct 2018 Tender amendment (tenderAmendment) · 8fa6f6fc-352a-4648-a1a7-1eecdab312d4-249544

more from Artelia Group

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.