Heavy Lifting Tower Cranes (SP13.1.1)- Old Oak Common (S4) Station - HS2

Balfour Beatty VINCI Systra JV Published 1 Jun 2022 Contracts Finder

key details

Value£20,000,000
Statusactive
Category (CPV) 42414150 +1 more
RegionLondon
Deadline20 Jun 2022
Contract start30 Sept 2024
Contract end31 Dec 2027
SME suitableNo
OCIDocds-b5fd17-9242dbe3-a763-4136-84d4-a348939857bb

description

Heavy Lifting Tower Cranes (SP13.1.1)

The HS2 Old Oak Common Station, is a 7-year project, with 1000 staff on site at peak period of construction.

Scope of Work:

The Subcontract works is to provide a minimum of 4 no. heavy lifting tower cranes across the Old Oak Common (OOC) Station Site.

The scope of works includes, but is not limited to, the provision of all necessary People, Equipment, Plant and Materials and execution of all stages from design, supply, mobilization, installation (including all lifting activities), operational commissioning, operation, maintenance & demobilization of all cranes.

Cranes are required to carry out lifting activities with maximum reach of 65-70m from tower crane position. It is estimated that the heaviest lifts, consisting of spliced steel beams will range from 15T to 24T (not including lift & tackle weights) at distances of 50m to 65m. The cranes are to over sail the station's structure which will be approx. 25m above the cranes' foundation level.

Due to the rail interfaces, the cranes will be operating with a de-rated by 25% capacity and are expected to be luffing Jib cranes.

Access routes to site need to be carefully considered due to 79T weight limit of a bridge on route to the site's location.

Programme

All cranes are required to be operational by January 2025 and the duration of the hire period is expected to be 2-3 years. Installation dates will be dictated by the solutions presented by the supplier and requirement or not to work under a possession regime for the neighboring live rail lines.

About the buyer's selection process:

Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.

The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.

What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).

Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.

The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.

What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity.

In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Interchange at Old Oak Common.

No Documentation is included at this point.

Additional information: No Documentation is included at this point.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
1 Jun 2022 Tender (tender) · c6b6d9c3-bbc6-4e71-9a44-ee2af43f3417-543624

more from Balfour Beatty VINCI Systra JV

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.