gvtcx

EKFB JV - Mechanical & Electrical Works for Green Tunnel Portal Building Fire Gas Suppression System Package

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 Published 24 Jun 2024 Contracts Finder

key details

Value£500,000
Statusactive
Category (CPV) 45311000 +24 more
RegionWest Midlands, East Midlands, South East
Deadline5 Jul 2024
Contract start25 Oct 2024
Contract end28 Mar 2025
SME suitableNo
OCIDocds-b5fd17-917d0c75-0a03-4cca-991f-c5acfd99dfc4

description

EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood. Our scope of the works includes 15 viaducts, 5 km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.

EKFB are looking for a competent contractor to provide the fire gas suppression system.

Design, supply, installation, testing, commissioning, certification, and integrity testing of the fire suppression system. This work should be based on the design intent shown in the respective drawings and specifications and comply with HS2 standards. The specialist will be responsible for the complete system, including coordination with mechanical and electrical contractors regarding damper locations, operation, and power requirements.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
24 Jun 2024 Tender (tender) · acc25346-a135-4b2f-b7b0-890dd75b805e-761468

more from Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.