gvtcx

Assessment of Hitachi-GE Allocation of Function for the UK ABWR

DEPARTMENT FOR WORK AND PENSIONS Published 18 Nov 2016 Contracts Finder

key details

Value£31,447
Statuscomplete
Category (CPV) 73000000
Deadline14 Jun 2015
Contract start15 Jun 2015
Contract end14 Sept 2015
SME suitableYes
OCIDocds-b5fd17-902db66b-adc8-11e6-9901-0019b9f3037b

Award

SupplierValueDateStatus
GREENSTREET BERMAN LTD £31,447 8 Jun 2015 active

description

1.1In January 2014 ONR formally started Step 2 of the GDA of Hitachi General Electric’s (Hitachi-GE) UK Advanced Boiling Water Reactor (UK ABWR). Hitachi-GE is the Requesting Party for the UK ABWR GDA (referred to as “the RP” in this specification).
1.2Step 2 concluded in August 2014 and involved an overview of the acceptability, in accordance with the regulatory regime of Great Britain, of the design fundamentals, including review of key nuclear safety and nuclear security claims with the aim of identifying any fundamental safety or security shortfalls that could prevent the issue of a Design Acceptance Confirmation (DAC) (see http://www.onr.org.uk/new-reactors/ngn03.pdf).
1.3During Step 2, ONR reviewed the key claims (assertions) put forward by the RP in the area of Human Factors (HF). Some of these claims relate to the adequacy of Allocation of Function (AoF) for the UK ABWR. ONR’s technical assessment reports covering the assessment work done during Step 2 and key conclusions are published on ONR’s website (http://www.onr.org.uk/new-reactors/uk-abwr/reports.htm).
1.4During Steps 3 and 4 of GDA ONR will undertake assessments that will increase in detail as GDA progresses, to confirm that the claims are supported by adequate arguments (reasoning) and evidence. ONR started Step 3 on 1 September 2014 and expects to complete it at the end of August 2015.
1.5During Step 4, ONR will assess the evidence by conducting in-depth reviews, on a sampling basis, of the HF aspects of the UK ABWR safety case and supporting analyses, to confirm that the claims and arguments are underpinned by robust evidence. ONR expects to start Step 4 of GDA on 1 September 2015 and complete it at the end of 2017.
1.6In the HF topic area, AoF may be considered one of the most important activities in the design of the new plant. ONR recognises this significance via the Safety Assessment Principle (SAP) EHF.2 which requires that:
“When designing systems, dependence on human action to maintain and recover a stable, safe state should be minimised. The allocation of safety actions between humans and engineered structures, systems or components should be substantiated.”
1.7Automation will be the general concept of operations for the UK ABWR, which will utilise advanced computerised technology extensively, particularly in the Main Control Room (MCR) and to a much greater extent than for current UK nuclear power plants.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
10 Jul 2015 Award (award) · ocds-b5fd17-902db66b-adc8-11e6-9901-0019b9f3037b-68978-onr-249

more from DEPARTMENT FOR WORK AND PENSIONS

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.