gvtcx

M1920-11 Installation of Communal LED Lighting, Rewiring of Communal Circuits, Suspended Ceiling Replacements and Replacement of Communal Distribution Boards at Kestrel House and Bishops House

South Essex Homes Published 25 Nov 2019 Contracts Finder

key details

Value£260,000
Statuscomplete
Category (CPV) 31200000 +4 more
Deadline13 Dec 2019
Contract start27 Jan 2020
Contract end27 Mar 2020
Procedureopen
SME suitableYes
OCIDocds-b5fd17-8d2acd1b-0ec7-4652-bca9-0face5ab9613

Award

SupplierValueDateStatus
Re-Gen (UK) Construction Ltd £233,945 20 Feb 2020 active

description

Applicable to both blocks: Rewire all communal circuits to corridors, store cupboards, lobbies, lounges, hairdressers, kitchens, guestrooms, warden's offices, laundry rooms, stairwells, boiler rooms, bin rooms and common external areas. Distribution Boards upgrades, replacement of plasterboard ceilings, installation of LED lighting. Rates to include protection of all communal internal floor areas during the works. Type and method of protection to be used shall be included within the method statement. Any damage to the Corridors, Lobbies, grass/pathways and stairwells or any other communal areas of flooring or external flower beds caused by the Contractor shall be rectified by the Contractor at no cost to South Essex Homes.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
25 Mar 2020 Award (award) · 3b44a6d3-6d39-493f-90c3-39b5031f3579-351517

more from South Essex Homes

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.