S30049 A38 Derby Junction Designing Validation Works
key details
| Value | £400,000 |
|---|---|
| Status | complete |
| Category (CPV) | 73220000 |
| Deadline | 16 Jan 2026 |
| Contract start | 27 Jan 2026 |
| Contract end | 31 May 2026 |
| Procedure | selective |
| SME suitable | Yes |
| OCID | ocds-b5fd17-0e6d2ed8-2de7-4014-aed4-ab6a05b449f1 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Arcadis Consulting UK Limited | £452,132 | 27 Jan 2026 | active |
description
Following on from Phase 1 GAP analysis a Detailed assessment of the design maturity to verify that the 3D digital model accurately represents the intended design, highlight and Risk, or gaps to filled before tender or by the oncoming Delivery Partner.
Proposed scope detail to Include:
| - | TA Design maturity assessment (design gap analysis) - completion based on information available to date. |
| - | PDP DCO and Stage 5 design basis - define what standards etc. - PDP design composition (List down PDP design deliverables used for this assessment) |
| - | PDP gap analysis exercise: a. Stage 5 design package completion status (% age complete, what is remaining) b. Stage 5 design package approval status and if approved with comments their significance (minor / major) (i.e. AIP approved, significance of any comments) |
| - | Define and list down design changes required post PDP work (i.e. DCO Requirements work partially completed or was not considered) |
| - | Define design changes made post PDP work (i.e. Update of Arcadis work from Nov 2024 to date) |
| - | Design opportunities / VE identification - Design risks emerging from prior to current scope including risks highlighted through gap analysis exercise |
Schedule of regular review meeting to monitor progress between National Highways and Arcadis to ensure output is met
| - | Final deliverable to be in a report format, which should include the following items: |
| - | Design overview background (This section to include PDP design prior to their termination of contract) |
| - | Design maturity, design completeness, design work remaining, and design status report - Update around assurance completed by Arcadis under TA role |
| - | Design opportunities / VE identification/Efficiencies |
| - | Carbon and biodiversity position |
| - | PDP DCO and Stage 5 design basis - define what standards etc - Define design changes made post PDP work (i.e. Update of Arcadis work from Nov 2024 to date) |
| - | Define and list down design changes required post PDP work (i.e. DCO Requirements work partially completed or was not considered) - Identify areas around design de-risking ahead of / during procurement for National Highways |
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 29 Jan 2026 | Award (award) | · | 5c96782d-d26d-498a-9cd2-9db89fd633b8-881417 |
more from National Highways Limited
- Awarded contract for ITEP0910 - MP Reporting Solutions Operate, Maintain and Continuous Improvement · £725,000 · 3 Jul 2026
- HRE - AGB/2 - Gullane to Longniddry - Aberlady Public Road · £82,952 · 3 Jul 2026
- HRE - Dalry - Kilmarnock - Annick Water - DAK/87 · £62,409 · 3 Jul 2026
- HRE - Elderslie - Greenock Princes Pier - Union Street - KLM/68 · £52,009 · 3 Jul 2026
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · £330,000 · 3 Jul 2026
- HADECS Consultancy · £88,899 · 2 Jul 2026
- HRE - MEL/24 - Alton - Knowle - Privett Tunnel · £14,784 · 2 Jul 2026
- HRE - AKC/95 - Alnwick to Cornhill - Alnwick Road · £49,982 · 1 Jul 2026
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- S30084 M60 Barton High Level Bridge - Bearing Adjustment - Cat 3 checks for the substructure AIP and GI survey reviews · National Highways Limited · £330,000
- S30128 Asset delivery asset maintenance (GM701) & inspection (GS801) update · National Highways Limited · £184,967
- S30113 IS055001 Auditing Services · National Highways Limited · £178,546
- S30102 Third Party NSIPs Technical Partner · National Highways Limited · £2,500,000
- S30099 NHSS Review Implementation Phase 3 · National Highways Limited · £50,000
- S30098 Strategic Charging Infrastructure (SCI) technical partner · National Highways Limited · £1,232,140
- S30112 Development of national guidance on the safety and accessibility of stopping places · National Highways Limited · £178,644
- S30073 Pavement Technical Services and Support 2026-29 · National Highways Limited · £450,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.