SASWP03.3 - Rail Systems - DBP3 Lines - Track/S&C Protecion, Signalling Design, Lineside Assets

Skanska Infrastructure (Rail) Published 23 Mar 2021 Contracts Finder

key details

Value£1,000,000
Statusactive
Category (CPV) 45234100 +4 more
RegionWest Midlands
Deadline31 Mar 2021
Contract start25 Jun 2021
Contract end30 Jun 2022
SME suitableNo
OCIDocds-b5fd17-8bffb29a-e7d9-46aa-9aa4-216af4b26598

description

Skanska SAS13 Bridge Replacement - Rail Systems WP03.3 Scope

  1. Track/S&C Protection

S&C Unit:

  • Disconnection and removal of Points Motors, Heating and Mechanical Parts - Secure for through running and certify.
  • Supply and Installation of Bespoke Rosehill or Similar Level Crossing Panels to Full S&C Unit 802 PTS
  • Supply and Installation of Bespoke Rosehill or Similar Level Crossing Panels to Half S&C Unit 802 PTS
  • Removal of Panel Units, Recommission S&C and Certify for Operation.

Permanent Way:

  • Installation and Removal of Ballast, Rail Head Protection and Membrane from Track system. Tamp where required though Plain Line and S&C. Recertify for EIS
  1. S&T:

Signalling Design

  • Any TSR, ESR Designs Required for EIS of Track System

Lineside Assets:

  • Disconnection and Removal of Minor S&T Lineside Assets such as SPT's and other minor equipment.
  • Installation, Reconnection and Certification of Assets
  • 3)Staff / Professional Service
  • Supply of Track CRE for Works
  • Supply of Signalling and Telecoms CRE for Works
  • Supply of Track Hand Back Engineers for Works
  • Supply of S&T Testers

Tenderers will be issued a formal invitation to tender (ITT) with a pricing and submission document to complete.

The submission will included a balanced scorecard requesting answers to questions (along with evidence) to be submitted for review and scoring. The highest scoring tenderers will be considered preferred tenderer for the works. High level criterial of the balanced scorecard questions will include:

Health & Safety

Quality

Sustainability

Environmental

Competence

Capability

Capacity

Commercial Price

Mid tender reviews will be held prior to the submission deadline to review the scope of works with the SAS13 project team. Following the submission deadline, there will be post tender reviews to review your submissions with the SAS13 project team.

Best and final offers may be requested from tenderers.

Skanska have been employed by Network Rail (NR) to replace the existing SAS 13 bridge to increase lateral clearance below the structure to enable the construction of HS2's new depot access lines and access to the new HS2 depot via road. The existing bridge forms the rail intersection between the Stechford to Aston (SAS) line and the Birmingham to Derby Line (DBP3).

The new bridge will be a 92m single spanning structure. Skanska's appointment by Network Rail includes the design and demolition of the existing bridge and installation of the new structure.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
23 Mar 2021 Tender (tender) · 22306dd0-0b87-448d-b90d-4654a0e1b6f4-422431

more from Skanska Infrastructure (Rail)

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.