BSH/ENR/Welsman Building Decarbonisation Project

Bristol City Council Published 4 Jan 2022 Contracts Finder

key details

Value£407,000
Statuscomplete
Category (CPV) 31500000 +5 more
Deadline10 Sept 2021
Contract start15 Dec 2021
Contract end31 May 2022
SME suitableYes
OCIDocds-b5fd17-8bf678cd-56d7-43f8-ab39-4ad40d4d7792

Award

SupplierValueDateStatus
Vital Energi Utilities Ltd £695,757 28 Oct 2021 active

description

Further competition under lot 4 of the Non-Domestic Energy Efficiency Framework DN457472.

Bristol City Council wishes to procure a contractor to carry out a number of decarbonisation measures to the Welsman Building.

The site has been awarded funding to decarbonise the heating system and reduce electricity consumption through the design, supply and installation of a number of measures. The measures have been developed by BCC consultant Anthesis, who have produced indicative designs for many of the elements of work. The Contractor will assume full design responsibility for the Works. The drawings and schedules provided as part of the works information are there to assist the contractor understand better the nature and scope of the works, but it is for the Contractor to ascertain the precise nature and extent of works required, and produce their own design. The Contractor's detailed design will be submitted for review and acceptance before works proceed

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
4 Jan 2022 Award (award) · 1f96ee33-93d4-4825-ad12-1562c1e9d7a6-497817

more from Bristol City Council

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.