HRS18 - Switches and Crossings (S&C) for HS2 Ltd
key details
| Value | £375,500,000 |
|---|---|
| Status | active |
| Category (CPV) | 34940000 +10 more |
| Deadline | 5 Feb 2021 |
| Contract start | 19 Apr 2022 |
| Contract end | 21 Aug 2030 |
| Procedure | selective |
| SME suitable | No |
| OCID | ocds-b5fd17-8a7a119c-99e8-45e1-9287-4b56e55f06e6 |
description
HS2 Ltd intends to procure across Phase One, Phase 2a, with an option exercisable to include those for Phase 2b of the project and the maintenance depots for the design, manufacture, delivery and provision of technical support for Switches and Crossings (S&C), including associated Points Operating Equipment (POE), together with Rail Expansion Devices (REDs). This includes installation of the condition monitoring system and POE.
The S&C system must include units that are proven in service.
In accordance with the Request to Participate ('RTP'), evidence will be required of S&C units designed, manufactured and delivered within the last 20 years which have a minimum of 2 years of use with commercial high-speed train services that meet all of the following criteria:
- They are installed on Pre-Cast concrete slab track;
- The 'diverging' path of the S&C layout uses a clothoidal (not circular curve) switch entry geometry at the turnout beginning; and
- They have a turn-out (diverging) speed of 200km/h or higher and a main line (through) speed of 300km/h or higher.
where the term "commercial high-speed train services" refers to services operating on specially built high-speed lines equipped for speeds generally equal to or greater than 250 km/h.
Phase One includes:
- 469 single track kms, including 250 bridges, 58 viaducts, 47 underbridges, 148 overbridges.
- Three passing / maintenance loops/sidings and four complex track junctions.
- 158 point ends, including 64 high-speed turnouts (between 130km/h and 230 km/h) and 72 low-medium speed turnouts (up to and including 100km/h) including 5 diamond crossovers and one set of trap points.
- 54 Rail Expansion Devices (REDs).
- Option for S&C Calvert Infrastructure Maintenance Depot and additional S&C at Washwood Heath Rolling Stock Depot.
Phase 2a includes:
- 116 single track kms, including 18 underbridges, 43 overbridges, 4 viaducts, 2 tunnels, 1 retained cutting.
- 23 point ends, including 18 high-speed turnouts(between 130km/h and 230km/h) and 5 low-medium speed turnouts (up to and including 100km/h).
- 23 Rail Expansion Devices (REDs).
- Option for S&C at Stone Infrastructure Maintenance Base.
Applicants should be aware that HS2 Ltd reserves the right to re-allocate work identified in the scope of this procurement between different HS2 Ltd contracts as it requires or to change the contractual structure set out in the Heads of Terms. As will be set out in detail in the ITT, HS2 Ltd also reserves the right to omit any of the work set out in this document from the final scope of work.
Further information on the procurement and on the Scope is included in the Candidate's Guide made available by HS2 Ltd and in the accompanying draft initial Procurement Documents (including the draft Invitation and draft Request to Participate ('RTP') documents).
HS2 Ltd intends to limit the number of Tenderers on the basis set out in section 4.7 of the draft Invitation.
documents
- https://www.contractsfinder.service.gov.uk/Notice/91410be6-1ad9-43a9-a97a-9e3f7300eb49 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 15 Dec 2020 | Tender (tender) | · | 91410be6-1ad9-43a9-a97a-9e3f7300eb49-400646 |
more from HS2
- Contracts for Automated People Mover (APM) System · £270,000,000 · 11 Mar 2026
- ABANDONED - HS2 Supply of Fleet of On-Track Machines Procurement · £123,950,617 · 5 Feb 2026
- ABANDONED - Green Assets Maintenance & Management Procurement · £209,408,000 · 22 Dec 2025
- ABANDONED - Phase One and Phase Two Stations Platform Edge Doors Framework Agreement · £93,000,000 · 31 Jul 2025
- LAN WIFI & SD-WAN Managed Services · £263,176 · 29 Jul 2025
- Commercial Assurance Services 2025 · £651,600 · 31 Mar 2025
- Stakeholder mapping and engagement to support HS2 Reset communications and engagement · £22,700 · 21 Mar 2025
- Counter Fraud and Business Ethics (CFBE) Expert Services · £76,400 · 18 Mar 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- GWR - Installation of Balises · FIRST GREATER WESTERN LIMITED · £2,500,000
- Gates and Platform Validators Design and Build · Transport for Wales
- Framework 092 Railway Approved Equipment and Services Supply · Ulsterbus · £0
- Heavy Maintenance Works - Trackworks DAR 2023 · Sellafield Limited · £336,990
- P-2698 Train Driver Route Learning System FW · Translink · £2,000,000
- LU/STA/PCRID/2021 · Transport for London · £3,937,270
- Development project for the provision of Cryogenic Railhead Cleaning · Northern Trains Limited
- Provision of Train Driver Simulators · NORTHERN TRAINS LIMITED
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.