Thames Tideway Tunnel - C405 Main Works West - Underground Structure to Ventilation Building at Hammersmith
key details
| Value | £1 |
|---|---|
| Status | complete |
| Category (CPV) | 44114000 +2 more |
| Region | London |
| Deadline | 18 May 2020 |
| Contract start | 6 Jul 2020 |
| Contract end | 31 Jan 2021 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-0e35aa73-46ef-4887-af66-355cd17b1673 |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| not named | £0 | 29 Jun 2020 | active |
description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
- a.tunnels:
- i.a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
- ii.11 connection tunnels, which will link flows from CSOs to the main tunnel.
- b.Worksites:
- i.five main tunnel Worksites (drive and/or reception sites)
- ii.16 CSO Worksites
- iii.two System modification Worksites Thames Tideway Tunnel
- iv.works at Beckton Sewage Treatment works.
Scope of Works
The Hammersmith Pumping Station (HAMPS) Inlet Channel forms part of the infrastructure for a live sewage pumping station. It will remain operational throughout the duration of the Main Contract works. This is a gravity-fed storm relief pumping station, with no physical or mechanical means of isolating the two sewers entering the Inlet Channel wet weather, thus all works are weather-dependent.
In order to ensure safety of the working teams, the Contractor has implemented a series of real-time catchment sewer monitoring along with computer modelling and weather forecast modelling tools which form part of the safe system of works (details can be provided on request). Within the Inlet Channel, two temporary weir walls were installed, which are interconnected with a series of flumes to divert the flows through the works area (referred to as dry zone), effectively creating a cofferdam within the sewer environment.
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
Additional information: Hammersmith Site
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=49138733 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/13a32235-d3d5-4bb5-8edb-7da07904080f , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Nov 2020 | Award (award) | · | 31252784-0771-40c4-a18d-c665066e7c0b-392642 |
more from BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Thames Tideway Tunnel - C405 Main Works West - Carnwath Road Pit Bottom Steel Alterations · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Intertidal Terrace · £1 · 5 Jul 2021
- Thames Tideway Tunnel - C405 Main Works West - Pipe Jacking works for Syphon Main ACTST · £500,000 · 9 Apr 2021
- Thames Tideway Tunnel - C405 Main Works West - Permanent Formwork Decking · 12 Mar 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Security Gates & Fencing · £1 · 17 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Steel Connection Shutters · 5 Feb 2021
- Thames Tideway Tunnel - C405 Main Works West - Bulkheads (Acton) · £1 · 8 Jan 2021
- Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead · £1 · 21 Oct 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Supply of Metric and Bottle Concrete · Manchester City Council · £520,000
- PLACE793H Supply of Ready Mixed and Volumetric Concrete · Derbyshire County Council · £4,500,000
- CPU 7633 Supply of Concrete · Nottingham City Council · £1,350,000
- NUN – Concrete Repairs · Nuneaton and Bedworth Borough Council · £2,500,000
- Balcony Works to 38 - 48 Dayton Road · KINGSTOWN WORKS LIMITED
- Aggregates and Concrete · Newcastle City Council
- WEP I Cardiff and Vale College (CaVC) Project Batch: D&B Contract Selection Questionnaire (SQ) · Bouygues UK
- WEP I Cardiff and Vale College (CaVC) Project Batch: D&B Contract Selection Questionnaire (SQ) · Bouygues UK
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.