gvtcx

HCA Demolition Framework

MI CONCEPTS LIMITED Published 21 Apr 2017 Contracts Finder
The value below is a framework or dynamic market ceiling: the maximum that could be spent across all call-offs, not the value of a single contract. Aggregate figures on this site exclude these to avoid double counting.

key details

Value£10,000,000
Statusactive
Category (CPV) 45111000 +3 more
Deadline26 May 2017
Contract start11 Aug 2017
Contract end9 Jul 2021
Procedureselective
SME suitableYes
OCIDocds-b5fd17-897c6765-7ac8-48e7-97ca-4336fa45ea03

description

This contract is a multidisciplinary framework agreement. The procurement is a TWO STAGE restricted process, which has a Pre-Qualifying Questionnaire and an Invitation to Tender. Suppliers must first submit Pre Qualifying information in order to be invited to tender.

The procurement covers all necessary activities to fulfil the HCA's requirements for demolitions and asbestos removal across its portfolio throughout the contract duration. This includes environmental appraisals and reports; asbestos reporting and asbestos strip; and all demolition activities including waste removal and recycling (see 'Scope of Works' below).

The HCA wish to appoint a selection of contractors in order to cover these requirements. Contractors may tender for one or more disciplines, and the HCA reserves the right to award either single discipline or multi-discipline contract on the basis of each tender. Each successful contractor appointed to the Framework will have submitted a schedule of rates, which will be relied upon as a guide when calling off works on an 'as needed' basis, although quotes will be requested. There may also be mini competitions for works between the appointed framework contractors. Appointed suppliers will be expected to work closely and cooperate with the HCA and other contracting authorities, as well as other contractors, and in-house departments or professionals (managers, consultants etc.).

*Scope of Works* -Environmentals:

Site Reports and Investigations Ecology and Biodiversity Reports Bat Reports

UXO Surveys

Radiation Surveys Ground Conditions and Ground Water Others.

-Asbestos Investigation Sampling Testing Reporting

-Asbestos Removal Prelims

Licensable ACM Removal Non - Licensable ACM Removal Disposal

  • Demolition Prelims Hard Strip Soft Strip Foundations Hard Standing Crushing Waste Waste Storage Waste Disposal Reclaim Materials Site Re-Cover
  • Project Management
  • CDM Coordination

Additional information: All submissions will be taken online, except in the case of special circumstances, when paper copies will be accepted. This is detailed in the provided documentation. Please contact the provided address for queries.

Furthermore, this is a restricted process over the OJEU Threshold. There are separate PQQ and ITT deadlines. There will be more documentation included at the next stage.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

more from MI CONCEPTS LIMITED

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.