Long Buckby Bridge- Soil Nail/ TB
key details
| Value | £100,000 |
|---|---|
| Status | active |
| Category (CPV) | 71311100 |
| Deadline | 10 Jul 2024 |
| Contract start | 1 Nov 2024 |
| Contract end | 6 Dec 2024 |
| SME suitable | Yes |
| OCID | ocds-b5fd17-88b8f9ab-ebf8-415a-bca5-6d3ae54bfae1 |
description
JMS have been awarded a contract from Network Rail for works at Great Brington & Long Buckby Bridge to commence approximately August 24. The main works at hand involve an embankment regrade and bridge strengthing works at Long Buckby. We require a supply chain partner to carry out the installation of a singular soil nail and 3no tie bars at Long Buckby Bridge (Nov 24). Drawings etc will be provided if PQQ is approved.
documents
- https://www.competefor.com/business/viewOpportunityDetailsSupplier.html?id=82144460 , tenderNotice
- https://www.contractsfinder.service.gov.uk/Notice/8afaddfb-d384-4d50-add9-de1b5f7ca173 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Jul 2024 | Tender (tender) | · | 8afaddfb-d384-4d50-add9-de1b5f7ca173-764486 |
more from J Murphy & Sons Limited
- HNR Roade Cutting - Spray Concrete Works · £50,000 · 8 Sept 2025
- Marston BBM Scheme · £20,000,000 · 13 Aug 2025
- Woburn BBM Scheme · £1,000,000 · 13 Aug 2025
- Greek Street - Deck Construction Works · £1,000,000 · 7 Mar 2025
- Oakengates Station- Drilling & Grouting Works · £500,000 · 8 Oct 2024
- Greek Street, Stockport. Rail bridge Reconstruction - FRC Package · £500,000 · 5 Jul 2024
- Kidsgrove Station- Tamping & Lift/ Slew Tender · £150,000 · 5 Jul 2024
- Great Brington- Deveg/ Rope Access & Fencing · £250,000 · 5 Jul 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- CT1509 NEAT RIBA Stages 3-7 · The City of Edinburgh Council · £485,000
- Programme Support · MINING REMEDIATION AUTHORITY · £150,000
- Engineering analysis and design software solutions for bridges · Caerphilly County Borough Council · £28,500
- Quality Strategic support 2025/2026 · National Highways · £115,000
- This work bank includes a portfolio of assets with varying degrees of complexity in terms of access, traffic management needs, public / TOC interface needs etc. · Network Rail Infrastructure Ltd
- Maentwrog Tunnel Inspections and Repairs 2025-29 · Nuclear Restoration Services Ltd · £600,000
- NRBL RSA3 Section 4 Phase 1 · London Borough of Enfield · £1,950
- Elizabeth Line - Drainage Condition Reports · Transport for London · £820,198
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.