Tender for CHP Units and Boiler for existing Energy Centre and Remedial Works
key details
| Value | £1,000,000 |
|---|---|
| Status | planned |
| Category (CPV) | 09300000 |
| Region | London |
| Contract start | 1 Nov 2021 |
| Contract end | 1 Aug 2022 |
| SME suitable | No |
| OCID | ocds-b5fd17-d7180cdd-4521-4ff8-9839-315d44e6219a |
description
Be First is a pioneering urban regeneration company wholly owned by Barking and Dagenham Council, but operating independently. The Council on behalf of Be First will be procuring Works Contracts for the Design and Installation of a new boiler, CHP Plant and Auxiliary Equipment. It is planned that the Works will commence in late 2021.
Scope of Works for this Works Contract
The Gascoigne East Energy Centre (GEEC) is an existing Energy Centre located at ground floor level in residential block B1 of the Gascoigne East Phase 1 development.
The Energy Centre currently serves 5No existing residential blocks, via a District Heating (DH) Network. Some plants and equipment have been installed within the GEEC as part of the Phase 1 works.
This Works Contract (Phase 2) shall include, but not be limited to, the following works elements that shall be described in detail in the Specification to be provided with the ITT.
At present, a number of the existing heat substations (installed by others as part of the Phase 1 Works) experience poor secondary side temperature control and high primary side return temperatures when operating at low loads. The Scope of Works of this Contract (Phase 2) shall also cover modifications to the existing heat substations as required to improve the part load performance. The Contractor shall be responsible for carrying out tests to determine the cause of the poor part load performance, including fine tuning of the control valve control loop as well as modifications to the permanent physical installation should the fine tuning of the control logic not be sufficient to improve performance.
Please note this PIN is purely for information only and does not automatically enrol suppliers to a future tender opportunity. This exercise is not part of any pre-qualification or selection process. It is intended as an awareness, communication and information-gathering exercise offering an opportunity for potential contractors to help understand commissioning intentions.
All information stated within the PIN are subject to change. The Council does not require at this stage any tender response documentation to be submitted other than an expression of interest by email to Adebimpe.winjobi@lbbd.gov.uk. latest by 20th April 2021.
Failure to respond to this expression of interest will not disqualify suppliers from any future tender.
If you have any questions or require further information regarding this opportunity, please contact Adebimpe.winjobi@lbbd.gov.uk. Any information provided to suppliers ahead of tender publication will be logged and published as part of the tender documents.
documents
- https://www.contractsfinder.service.gov.uk/Notice/5bea769b-05c1-4c4d-b0fb-67298c3f08f5 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
2 notices published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 11 Apr 2021 | Planning (planning) | · | 1d729c12-c949-4ed3-927b-c9b38d491636-427593 |
| 13 Jul 2021 | Tender (tender) | · | 5bea769b-05c1-4c4d-b0fb-67298c3f08f5-451063 |
more from London Borough of Barking and Dagenham
- Leys Park Changing Pavilion Dagenham, Refurbishment · 20 Jun 2026
- HIRE AND MAINTENANCE OF USED OUT-FRONT ROTARY MOWERS · £97,190 · 27 Feb 2026
- Dagenham Heathway Lighting Scheme · £300,000 · 13 Oct 2025
- Corrigendum to Deed of Variation of Leisure Operating Contract notice · £82,500,000 · 10 Oct 2025
- Maintenance, adhoc construction and civil engineering works and associated services for highways LOT 1 · £55,000,000 · 17 Sept 2025
- Maintenance, adhoc construction and civil engineering works and associated services for street lighting LOT 2 · £10,000,000 · 17 Sept 2025
- Provision of in-house Counselling Services · £170,000 · 16 Jun 2025
- Bespoke Packages of Care for Children in Need, Children in Care, Children with a Disability and Children subject to a Child Protection Plan · £3,400,000 · 4 Mar 2025
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- PfH - Responsive Repairs, Disrepair Works and Void Services · Procurement for Housing · £725,000,000
- Supply of Metered Electricity · NORTHERN IRELAND WATER LIMITED · £534,000,000
- Provision of Air Source Heat Pump Systems and Solar Photovoltaic Arrays for Four Children and Family Hubs in Leicestershire · Leicestershire County Council · £98,507
- Utility provider Electricity · mhs homes group · £955,868
- Heating Replacement Works - Phase 2 · SHARE MULTI ACADEMY TRUST
- Installation of Air Source Heat Pump System at Fleetdown Community Centre, Dartford · Dartford Borough Council
- The Flexible Procurement and Supply of Half Hourly Electricity · ASSOCIATED BRITISH PORTS · £185,000,000
- The Keys Academy Trust – Fixed Electricity & Gas Supply Products - Contract Award · The Keys Academy Trust · £253,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.