Manufacture and Installation of a Lifting Bridge at Lodgemore Lane, Stroud
key details
| Value | £250,000 |
|---|---|
| Status | active |
| Category (CPV) | 44210000 +11 more |
| Region | South West |
| Deadline | 6 Jul 2015 |
| Contract start | 10 Aug 2015 |
| Contract end | 8 Feb 2016 |
| SME suitable | No |
| OCID | ocds-b5fd17-80fe536e-adc8-11e6-9901-0019b9f3037b |
description
Suppliers must have previous experience of manufacture and installation of bridges. Lodgemore Lane Lifting Bridge is to be located on the site of an existing fixed bridge which once formed a swing bridge built in the 1940`s to replace an earlier swing bridge. The bridge is a mixed usage bridge which also acts as one of two primary routes across a presently unrestored section of the Stroudwater canal to the WSP Lodgemore Textile Mill. The existing fixed bridge is to be demolished and replaced by a manually operated overhead counterweight lifting bridge. The scope of the Contract is for the <i>Contractor</i> to act as <i>Principle Contractor</i> under CDM and undertake the detail design, manufacture, works assembly, works testing, transport to site, erection, site testing, commissioning, complete documentation, including Operational and Maintenance (O&M) Manuals information for Health & Safety file and Technical file for, CE Marking, facilities for full testing, software and programming tools and setting to work of: Demolishing, removal and disposal of the existing bridge deck. A new overhead counterweight lifting bridge with fabricated bridge deck and fabricated counterweight superstructure complete with parapets andsurfacing. Demolishing, removal and disposal of the existing bridge foundations. New civil works foundations at the nose and tail of the bridge. Manually operated traffic barriers on both the North and South approachesto the bridge. Cabling and wiring including containment and draw pits for the site asrequired by the new systems (If required) Street furniture bollards on the North and South approaches to the bridge. A new operators pedestal containing the manually operated hydraulicpump for lifting the bridge. Bridge bearings. Other more minor items as further described in the system documentation
Additional information: The scope of the Contract is for the Contractor to act as Principle Contractor under CDM and undertake the detail design, manufacture, works assembly, works testing, transport to site, erection, site testing, commissioning, complete documentation, including Operational and Maintenance (O&M) Manuals information for Health & Safety file and Technical file for, CE Marking, facilities for full testing, software and programming tools and setting to work of: Demolishing, removal and disposal of the existing bridge deck. A new overhead counterweight lifting bridge with fabricated bridge deck and fabricated counterweight superstructure complete with parapets and surfacing. Demolishing, removal and disposal of the existing bridge foundations. New civil works foundations at the nose and tail of the bridge. Manually operated traffic barriers on both the North and South approaches to the bridge. Cabling and wiring including containment and draw pits for the site as required by the new systems (If required) Street furniture bollards on the North and South approaches to the bridge. A new operators pedestal containing the manually operated hydraulic pump for lifting the bridge. Bridge bearings. Other more minor items as further described in the system documentation.
documents
- https://www.contractsfinder.service.gov.uk/Notice/16471b3f-4f73-4148-a84e-db7d90ee7943 , tenderNotice
- https://www.supplyingthesouthwest.org.uk/procontract/supplier.nsf/frm_opportunity?OpenForm&contract_id=CONTRACT-9X4E-WFUZ39 , tenderNotice
Documents are linked, not mirrored. They are served by the publishing authority and may require registration.
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 18 Jun 2015 | Tender (tender) | · | ocds-b5fd17-80fe536e-adc8-11e6-9901-0019b9f3037b-67339-325053087 |
more from Stroud District Council
- Berkeley (Marybrook Street) · £45,000 · 2 Apr 2025
- Brimscombe Port Mill Ground Floor WC Refurbishment & Salthouse External Maintenance · £55,000 · 2 Apr 2025
- Tenant Profiling · £40,000 · 14 Feb 2025
- Fromebridge Biodiversity Project, Fromebridge Wetlands · £60,000 · 13 Feb 2025
- Digital Telecare Monitoring Service · £180,000 · 15 Jan 2025
- Ebley Mill , Internal alterations January 2025 · £80,000 · 5 Jan 2025
- Stonehouse High Street Public Car Park - Refurbishment. · £64,000 · 8 Nov 2024
- Gloucestershire & South Gloucestershire Warm & Well Scheme 2025 - 2028 · £1,225,000 · 21 Oct 2024
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- 06351/Fieldhead Campsite Pods · Peak District National Park Authority · £80,000
- River of Light 2024 - Security & Stewarding · Liverpool City Council · £74,632
- MAST-U Increased Structural Strengthening and Replacement of Panels · United Kingdom Atomic Energy Authority
- Maintenance of of Torton Bodies Portacabins · Post Office Limited · £45,000
- Award of CT1317 - Edinburgh Public Toilets in Parks · The City of Edinburgh Council · £600,000
- BE24112 - Upper Chamber Support Structure · UK SHARED BUSINESS SERVICES LIMITED · £27,950
- Atrium Roof Pre-Construction · UNIVERSITY OF DERBY · £43,854
- OSHA MMC Cat 1 & Cat 2 Framework · Great Places Housing Group · £2,000,000,000
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.