key details

Value£1
Statusactive
Category (CPV) 38000000 +1 more
Deadline12 Apr 2017
Contract start12 May 2017
Contract end31 Jul 2017
Procedureopen
SME suitableYes
OCIDocds-b5fd17-7f58a10b-6253-452e-b9d6-50fc2acdccbc

description

This large area, high quality CVD graphene growth system will initially be located within the NGI. Moving to the GEIC once opened. The purpose of the system is to produce high quality CVD graphene growth capability for researcher at the University of Manchester. Large area as be define as greater than A4 (210x 300mm). Quality is essential with reproducibility been definable.

The GEIC equipment fund is part financed by the European Regional Development Fund (ERDF) funds having been awarded under the 2014-2020 Priority Axis 1: Promoting Research and Innovation.

The equipment is being purchased for the Graphene Engineering and Innovation Centre ("GEIC") at the University of Manchester. The GEIC is a £60 million investment which will establish a state of the art research and technology development facility for graphene and related 2D materials. Projects in the GEIC will be industry-led and will focus on innovation and applications, with the aim of accelerating research through to products in the marketplace. The GEIC will house pilot production facilities and characterisation equipment. It will initially focus on a number of the University's world-class graphene application areas: energy, composites, formulations and coatings, electronics and membranes.

Given the world leading graphene research at the University, it is expected that all the equipment in the GEIC will be cited in high profile academic publications as well as underpinning industrial collaboration projects, thus giving the equipment a high degree of exposure.

The GEIC will be situated on the North Campus of The University of Manchester, comprise of ~8400 m2 and has been designed by world-renowned architect Rafael Viñoly. It is set to be open in summer 2018. Equipment purchased before the GEIC building is opened will be temporally commissioned elsewhere in the University campus, typically in the National Graphene Institute, and then moved into the GEIC once it is completed.

For further information on the GEIC please see: http://www.graphene.manchester.ac.uk/collaborate/geic/

This large area, high quality CVD graphene growth system will initially be located within the NGI. Moving to the GEIC once opened. The purpose of the system is to produce high quality CVD graphene growth capability for researcher at the University of Manchester. Large area as be define as greater than A4 (210x 300mm). Quality is essential with reproducibility been definable.

Please note, since the original advert the university has relaxed its minimum requirement under MR6.

Additional information: Following an initial tender exercise this requirement is being extended a further 15 days.

documents

Documents are linked, not mirrored. They are served by the publishing authority and may require registration.

notice history

1 notice published against this procurement.

PublishedTypeRegimeNotice
28 Mar 2017 Tender amendment (tenderAmendment) · 5f5f2484-4061-4fe7-a5bb-e61a01dce6d4-138201

more from UNIVERSITY OF MANCHESTER

all contracts from this buyer →

similar contracts awarded

Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.

source

Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.