Burgess Bridge - Scour Repair
key details
| Value | £35,500 |
|---|---|
| Status | complete |
| Category (CPV) | 45221100 |
| Region | Yorkshire and the Humber |
| Deadline | 14 Aug 2019 |
| Contract start | 16 Sept 2019 |
| Contract end | 11 Oct 2019 |
| Procedure | open |
| SME suitable | Yes |
| OCID | ocds-b5fd17-7b28904a-6466-485c-8176-c6a8194ba66e |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Hinko Construction Ltd | £35,500 | 14 Aug 2019 | active |
description
North Yorkshire County Council wishes to appoint a contractor to carry out Riverbed Scour Repair at Brgess Bridge (footbridge), down Nidd Gorge, Harrogate. Dates 16/09/2019 - 11/10/2019
Works Include:
Access Creation - Felling of Trees on the riverbank, to be undertaken by Forestry Commission prior to works start to clear access. Himalayan Balsam to be cleared from the access route. If contractor requires temp access route to be created, Heavy Duty Mats must be used.
Enviromental Protection - Two silt traps to be installed across the full width of the river prior to any works taking place with the water course. To be monitored and installed/ removed with care. Contractor to ensure that any silt which is mobilised during the course of the works should be preventing from entering the watercourse. 2 rows of silt traps are the minimum required for this contract. Regular compliance checks will be carried out
Scour repair - Large voids in Spans 2,3 & 4 to be filled using locally sourced rock. To be lowered in using excavator, starting with Span 2. Voids to be filled up to the existing scour protection, and to form a sensible gradient with levels taken 6m upstream and 3m downstream.
Tree removal - Large tree on downstream side to be removed as access becomes available. to be cut down in stages are removed to the banks, where it will be disposed of.
Stone Cladding Repair/Repoint. - Areas marked in MS. 3 stones to be replaced and repointed, section of pier 2 to be repointed. To be undertaken once river bed levels have been restored to the original level.
Demobilize - area to be restored to original condition and site to be left clean and tidy
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 5 Sept 2019 | Award (award) | · | 3ba7ac22-ebcb-4ad7-83c1-366a1c617257-312285 |
more from North Yorkshire County Council
- York and North Yorkshire Local Enterprise Partnership (YNY LEP) Skills Bootcamps – Wave 4 · £5,732,620 · 14 Oct 2024
- MIS/FAS in Educational Establishments Framework · £5,600,000 · 26 Oct 2023
- GB-Northallerton: TPPL North Yorkshire County Council NEPO HGV Lot 1 - 9 x Narrow Refuse Vehicles (15090) · £2,170,170 · 6 Jul 2023
- GB-Northallerton: TPPL North Yorkshire County Council BNES Bus Lot 2 - 23 x 17 seat (incl. driver) wheelchair accessible minibuses (14317) · £829,000 · 4 Jul 2023
- River Rye Footbridge Removal and Replacement · £30,000 · 31 Mar 2023
- Young Peoples Pathway · 30 Mar 2023
- Care Rooms Pilot (Continuing Proof of Concept) · £374,003 · 30 Mar 2023
- Storiths Lane Landslip, Bolton Abbey · £450,000 · 22 Mar 2023
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- Queens Bridge A93-03 Remedial Works · Perth & Kinross Council · £71,663
- Liss Bridge Works · East Hampshire District Council · £40,070
- Barrier Safety Improvement Scheme · Humber Bridge Board · £5,000,000
- Centurion Way combined footway and cycleway works: Cucumber Farm to Littlewood Bridge · South Downs National Park Authority
- HNL - AOMR - Charville Lane access bridge replacement · Environment Agency · £168,006
- Moorside & Wardley Railway Bridge Refurbishment Scheme · Salford City Council · £134,420
- HNL - AOMR - Cottage Weir North Footbridge · Environment Agency · £82,973
- Milner Lane Culvert Rebuild (L1255) 2025 · Leeds City Council · £21,300
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.