Study into the transport infrastructure at Hanborough Station and the surrounding area - AWARD
key details
| Status | complete |
|---|---|
| Category (CPV) | 71311200 +1 more |
| Region | South West |
| Deadline | 1 Feb 2019 |
| Contract start | 4 Feb 2019 |
| Contract end | 31 Mar 2019 |
| Procedure | open |
| SME suitable | No |
| OCID | ocds-b5fd17-7a7d9ecb-e5b8-43dd-bba6-65f1f305482f |
Award
| Supplier | Value | Date | Status |
|---|---|---|---|
| Integrated Transport Planning Ltd. | £19,385 | 8 Apr 2019 | active |
description
The purpose of this study is:
- Identify the current role and function of Hanborough Station and the main current issues associated with the station and the rail service (such as traffic congestion on the A4095, single track line, short platform and sub-standard pedestrian and cycle network);
- Set out the main improvements currently planned for Hanborough Station and the Cotswold and Malvern Line, together with a timeline for provision;
- Consider the potential role of Hanborough Station as a transport/mobility hub and what additional improvements would be feasible in the short, medium and long term, including the provision of appropriate vehicular, public transport, pedestrian and cycle connections to the station as part of an assessment of 'first/last mile' and 'whole journey passenger needs', especially from the proposed developments at Eynsham, Witney and Woodstock; and
- Look at the opportunities to facilitate the funding and delivery of improvements, including consideration of the production of a Station Travel Plan.
The study will also form part of the supporting evidence base for the Area Action Plan (AAP) and the Supplementary Planning Document (SPD) being produced for the garden village and West Eynsham, respectively, and for the West Oxfordshire Infrastructure Delivery Plan (IDP).
notice history
1 notice published against this procurement.
| Published | Type | Regime | Notice |
|---|---|---|---|
| 9 Apr 2019 | Award (award) | · | 0cabfc06-0124-4602-91b0-e6c699300f3c-282379 |
more from Publica Group
- Cashless Parking Services for Cotswold District and Forest of Dean District Councils - AWARD · £50,000 · 2 Feb 2021
- European Protected Species 2 Year bat roost monitoring · 1 Feb 2021
- Provision of footfall counting and reporting service within Cotswolds, Forest of Dean and Stroud town centres. · £50,000 · 7 Jan 2021
- Whole-building, low-carbon office modelling and options appraisal for West Oxfordshire District Council offices · £30,000 · 3 Dec 2020
- Burrows Playing Fields Pitches Improvements · £590,000 · 1 Dec 2020
- Burrows Sports Pavilion Refurbishment · £310,000 · 26 Nov 2020
- For the provision of replacement fire rated timber door assemblies and associated works · £100,000 · 25 Nov 2020
- Renovation and Re-Roofing of 105-107 Winchcombe Street · £85,000 · 9 Nov 2020
all contracts from this buyer →
similar contracts awarded
Other awarded contracts in the same category. Useful for seeing who normally wins this kind of work, and at what value.
- B769 and Kingston Road Double White Line System · East Renfrewshire Council · £17,273
- PAHT - Transport Planning, ego-tech and ecological consultancy · The Princess Alexandra Hospital NHS Trust · £52,350
- Movement and Place · City of York Council · £1,150,000
- Traffic Signals - Installation Support · Newcastle City Council · £1,000,000
- Mass Transit Commercial Support Services · West Yorkshire Combined Authority · £104,000
- WNC support for BSIP,EP and zero Bus Emissions Strategy · West Northamptonshire Council
- Strategic Transport Support Services · Blackburn With Darwen Borough Council · £150,000
- Award of CW0277-02 Bus Network Review (Phase 2) · Fife Council · £67,819
source
Published on Contracts Finder. Contact details for named individuals are not reproduced on this site.